Size: 145
Comment:
|
Size: 261
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
Due to the foreseen switch to the NCS (New Control System) for the IRAM-30m, the Pool Observing System is being adapted to the NCS. | * Due to the foreseen switch to the NCS (New Control System) for the IRAM-30m, the Pool Observing System is being adapted to the NCS. |
Line 3: | Line 3: |
* We have switched to the NCS since Dec. 2005. The Pool system is now running under the NCS. 05-09-2006 |
- Due to the foreseen switch to the NCS (New Control System) for the IRAM-30m, the Pool Observing System is being adapted to the NCS.
27-10-2005
- We have switched to the NCS since Dec. 2005. The Pool system is now running under the NCS.
05-09-2006