Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2005-10-27 07:02:49
Size: 146
Editor: mrt-lx2
Comment:
Revision 3 as of 2005-10-28 18:20:57
Size: 145
Editor: mrt-aod
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Due to the foreseen switch to the NCS (New Control System) for the IRAM-30m, the Pool Observing System is being adapted to the NCS.  Due to the foreseen switch to the NCS (New Control System) for the IRAM-30m, the Pool Observing System is being adapted to the NCS.

Due to the foreseen switch to the NCS (New Control System) for the IRAM-30m, the Pool Observing System is being adapted to the NCS. 27-10-2005

PoolProject (last edited 2009-04-16 08:26:26 by localhost)