⇤ ← Revision 1 as of 2005-10-27 07:02:49
Size: 146
Comment:
|
Size: 152
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
Due to the foreseen switch to the NCS (New Control System) for the IRAM-30m, the Pool Observing System is being adapted to the NCS. | Due to the foreseen switch to the NCS (New Control System) for the IRAM-30m, the Pool Observing System is being adapted to the NCS. $DATE$ |
Due to the foreseen switch to the NCS (New Control System) for the IRAM-30m, the Pool Observing System is being adapted to the NCS. $DATE$ 27-10-2005