Differences between revisions 8 and 15 (spanning 7 versions)
Revision 8 as of 2008-11-15 14:09:00
Size: 2950
Editor: mrt-lx17
Comment:
Revision 15 as of 2008-11-20 21:36:14
Size: 3108
Editor: 31
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
[[TableOfContents(5)]]
Line 16: Line 18:
 * http://www.iram.es/IRAMES/contact/access.html Information on Travel to IRAM Granada] summary about flight connections to Granada, bus connections from Malaga, and the transport schedule to the telescope.  * [http://www.iram.es/IRAMES/contact/access.html Information on Travel to IRAM Granada] summary about flight connections to Granada, bus connections from Malaga, and the transport schedule to the telescope.
Line 22: Line 24:
 * A [http://www.iram.es/IRAMES/mainWiki/TelescopeSystemStatus system status] gives information on possible problems at the telescope  * [http://www.iram.es/IRAMES/mainWiki/TelescopeSystemStatus The present status of the observatory hard- and software]
 * [http://www.iram.es/IRAMES/mainWiki/PooledObservingPage Pooled observations and data bases]
Line 25: Line 28:
 * Data reduction:
  * GILDAS THE IRAM Software Package
  * MOPSIC IRAM Bolometer Software by R.Zylka
  * [http://cassis.cesr.fr/ CASSIS] Spectral Line Analysis Software by E. Caux
Line 32: Line 32:

== Data reduction ==
 * [http://www.iram.fr/IRAMFR/GILDAS/ GILDAS] THE IRAM Software Package
 * MOPSIC IRAM Bolometer Software by R.Zylka
 * [http://cassis.cesr.fr/ CASSIS] Spectral Line Analysis Software by E.Caux et al.

TableOfContents(5)

Planning an observing run

Getting to the site

At the telescope

Data reduction

Observing30mTelescope (last edited 2009-07-11 19:06:57 by visitor4)