Differences between revisions 4 and 5
Revision 4 as of 2007-06-18 16:38:49
Size: 2846
Editor: visitor15
Comment:
Revision 5 as of 2009-04-16 08:26:25
Size: 2846
Editor: localhost
Comment: converted to 1.6 markup
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
11.06.2007-11:00: [[BR]]
 Granada: DJ, RM, SN, HU [[BR]]
 CAHA: SL [[BR]]
 PV: JP (later with SL) [[BR]]
11.06.2007-11:00: <<BR>>
 Granada: DJ, RM, SN, HU <<BR>>
 CAHA: SL <<BR>>
 PV: JP (later with SL) <<BR>>
Line 6: Line 6:
[[TableOfContents]] <<TableOfContents>>
Line 12: Line 12:
bolometer tests will be performed after that maintenance time. [[BR]] bolometer tests will be performed after that maintenance time. <<BR>>
Line 15: Line 15:
mode) with a throw of 90". (accTest.pako in pools07). [[BR]] mode) with a throw of 90". (accTest.pako in pools07). <<BR>>
Line 17: Line 17:
problem ? [[BR]] problem ? <<BR>>
Line 19: Line 19:
from that page (http://www.iram.es/IRAMES/mainWiki/MamboWebPage) [[BR]] from that page (http://www.iram.es/IRAMES/mainWiki/MamboWebPage) <<BR>>
Line 21: Line 21:
monitoring the pointing sources used during the bolometer observations. [[BR]] monitoring the pointing sources used during the bolometer observations. <<BR>>
Line 29: Line 29:
until 25.06 for bolometer tests/observations. [[BR]] until 25.06 for bolometer tests/observations. <<BR>>
Line 31: Line 31:
coordinated with WB [[BR]] coordinated with WB <<BR>>
Line 41: Line 41:
electromagnetic pulse ? [[BR]] electromagnetic pulse ? <<BR>>
Line 50: Line 50:
bolometer should be kept cooled until these tests. [[BR]] bolometer should be kept cooled until these tests. <<BR>>
Line 53: Line 53:
noise. JP noted that we have no specification about that platform. [[BR]] noise. JP noted that we have no specification about that platform. <<BR>>
Line 56: Line 56:
be performed directly on the bolometer platform and in the Rx cabin. [[BR]] be performed directly on the bolometer platform and in the Rx cabin. <<BR>>
Line 61: Line 61:
and check [[BR]] and check <<BR>>
Line 64: Line 64:
bolometer vibrations. [[BR]] bolometer vibrations. <<BR>>

11.06.2007-11:00:

  • Granada: DJ, RM, SN, HU
    CAHA: SL
    PV: JP (later with SL)

<General>

1. According to JP, it is very likely that from the Wed. 20.06 the telescope will be available after the heavy maintenance for observation tests. Then bolometer tests will be performed after that maintenance time.
2. For the bolometer tests, the observing procedures with the absorber prepared for the last tests will be used: on-off in azimuth and elevation (asymmetric mode) with a throw of 90". (accTest.pako in pools07).
3. Question to RZ: Are all the bolometers equally affected by the acceleration problem ?
4. A bolometer status page was created. The minutes will be posted in a link from that page (http://www.iram.es/IRAMES/mainWiki/MamboWebPage)
5. TT time is allocated during the period 22.06-25.06 and will serve for monitoring the pointing sources used during the bolometer observations.

<People>

1. During heavy maintenance (18.06-22.06), JP, DJ & SN will be present at the telescope. JP will be available during the day. SL will be present from 20.06 until 25.06 for bolometer tests/observations.
2. Some of the time may be used for remote observing tests with Bonn. To be coordinated with WB

<ElectricProblem>

1. SN & DJ will be available to measure some electric influence connecting an oscilloscope to mambo2 (channel outputs, more?): electric spikes in correlation with higher noise, earth problem may be difficult to detect (SN), electromagnetic pulse ?

<VibrationProblem>

1. The changes of parameters in the drive program to test the bolometer response will be done during NCS TT in late June/early July (HU) with the NCS team. The bolometer should be kept cooled until these tests.
2. The mambo2 platform may be "tuned" (how?) to check the effects of a less effective vibration damping. This will be correlated with the spike intensity noise. JP noted that we have no specification about that platform.
3. The technician responsible for the vibration measurements during the heavy maintenance will be at the telescope the 20.06/21.06. Some measurements will be performed directly on the bolometer platform and in the Rx cabin.
4. JP commented the difference between the Cascade/Basic driving procedures. Cascade Controller used during tracking seems to show more abrupt movements than the Basic mode. We will try two different on-off configurations, with small and large offsets (>< 400 "), to switch between the two driving modes and check
for difference in the bolometer response. 5. The pump connection will be investigated to check its effects on the bolometer vibrations.

Minutes11062007 (last edited 2009-04-16 08:26:25 by localhost)