Back to the NIKA run 9

Control and Backend Room

Ethernet and power connections at the end of run9:

n2 has been put under the floor (still connected). n3 has been stored with the computers.

NIKA Cage

Telescope Cabin

  • Power switch : 4 connections
  • Rack electronic:
    • Disconnected because of the GISMO observing campaign and put at the entrance of the telescope cabin.
  • Mcbook. It has been stored in the backend room with the others computers.
  • Mppsync, HWP modulator, HWP, Wollaston Prism, gunn diode and its control electronics come back to Grenoble for treatments.