Size: 727
Comment:
|
Size: 719
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 9: | Line 9: |
- FieldPoint automate backup (Andrea) | - FP automate backup (Andrea) |
We bring back to Grenoble
- polarisation box (and cable) for Yebes amplifier (Martino)
- Backup arrays (Alessandro)
- PT pipes keys (Andrea)
- FP automate backup (Andrea)
We leave at the telescope (spiral room)
- Portable spectrum analyser with feedback
- iMACRT + MMR3 (backups for NIKA2)
- 4 cables SMA Minicircuits (2m long) plus a few shorter cables
- Tools box including some vacuum stuff and RF parts (connectors, amplifiers, mixers, attenuators etc.)
- Ammortizzatori
- A few Norcan bars
We leave at the telescope (after run polar)
- NIKA cryostat
- 3He reserve (well closed, and with "bouchon")
- NIKA Pumping system
- NIKA electronics rack