Differences between revisions 85 and 91 (spanning 6 versions)
Revision 85 as of 2011-04-20 11:00:24
Size: 912
Editor: PabloMellado
Comment:
Revision 91 as of 2011-06-22 11:28:26
Size: 1062
Editor: lt-ck
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
#acl GismoTeam:read,write,delete -All:read Default #acl GismoTeam:read,write,delete Default
Line 14: Line 14:
 * Overall coordinator: '''Samuel Leclercq''' <leclercq@iram.fr> (IRAM/Grenoble)
Line 15: Line 16:
 * Overall coordinator: Samuel Leclercq (IRAM/Grenoble)
Line 18: Line 18:
== to do list ==

 * ToDoList (restricted access)
Line 22: Line 26:
[[GismoRun4|Go to the 4th run Wiki page]] [[GismoRun4|Go to the 4th run Wiki page]] (restricted access, please send an email to SL to obtain the login information)

GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the IRAM 30m telescope

This page is maintained by CK, SL, and the GISMO team


People

  • Overall coordinator: Samuel Leclercq <leclercq@iram.fr> (IRAM/Grenoble)

  • GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs

  • Main contact IRAM/Granada: Carsten Kramer (station manager)

to do list


4th test run, April 2011

Go to the 4th run Wiki page (restricted access, please send an email to SL to obtain the login information)

3rd test run, April 2010

Go to the 3rd run Wiki page

2nd test run, October 2008

Go to the 2nd run Wiki page

1st test run, November 2007

Go to the 1st run Wiki page

GoddardIramSuperconductingTwoMillimeterCamera (last edited 2014-03-31 13:30:45 by gra-lx17)