Size: 855
Comment:
|
Size: 1001
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the 30m telescope = | #acl GismoTeam:read,write,delete Default = GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the IRAM 30m telescope = |
Line 14: | Line 15: |
* Overall coordinator: Samuel Leclercq (IRAM/Grenoble) | * Overall coordinator: Samuel Leclercq <leclercq@iram.fr> (IRAM/Grenoble) |
Line 21: | Line 22: |
[[GismoRun4|Go to the 4th run Wiki page]] | [[GismoRun4|Go to the 4th run Wiki page]] (restricted access, please send an email to SL to obtain the login information) |
GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the IRAM 30m telescope
This page is maintained by CK, SL, and the GISMO team
Contents
People
GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs
Overall coordinator: Samuel Leclercq <leclercq@iram.fr> (IRAM/Grenoble)
- Main contact IRAM/Granada: Carsten Kramer (station manager)
4th test run, April 2011
Go to the 4th run Wiki page (restricted access, please send an email to SL to obtain the login information)
3rd test run, April 2010
2nd test run, October 2008