Differences between revisions 80 and 81
Revision 80 as of 2011-04-08 09:55:39
Size: 793
Editor: GismoTeam
Comment:
Revision 81 as of 2011-04-08 10:06:14
Size: 855
Editor: GismoTeam
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer = = GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the 30m telescope =

GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the 30m telescope

This page is maintained by CK, SL, and the GISMO team


People

  • GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs

  • Overall coordinator: Samuel Leclercq (IRAM/Grenoble)
  • Main contact IRAM/Granada: Carsten Kramer (station manager)


4th test run, April 2011

Go to the 4th run Wiki page

3rd test run, April 2010

Go to the 3rd run Wiki page

2nd test run, October 2008

Go to the 2nd run Wiki page

1st test run, November 2007

Go to the 1st run Wiki page

GoddardIramSuperconductingTwoMillimeterCamera (last edited 2014-03-31 13:30:45 by gra-lx17)