Differences between revisions 79 and 96 (spanning 17 versions)
Revision 79 as of 2011-04-05 16:31:38
Size: 715
Editor: GismoTeam
Comment:
Revision 96 as of 2011-06-22 11:34:48
Size: 1347
Editor: lt-ck
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer = #acl GismoTeam:read,write,delete Default
= GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the IRAM 30m telescope =
Line 13: Line 14:
 * Overall coordinator: Samuel Leclercq (IRAM/Grenoble)  * Overall coordinator: '''Samuel Leclercq''' <leclercq@iram.fr> (IRAM/Grenoble)
 * GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs
Line 15: Line 17:
 * GISMO PI: Johannes Staguhn <johannes.g.staguhn@nasa.gov>
== Publications ==
 
 1. [[http://arxiv.org/abs/1106.2092|Dwek, Staguhn et al. 2011]]
 1. [[http://arxiv.org/abs/1103.6225|Arendt et al. 2011]]
 1. [[http://arxiv.org/abs/1101.3586|Capack et al. 2011]
 1. [[http://arxiv.org/abs/0907.1300|Dicker et al. 2009]]

== Things to do for 1st open run ==

 * ToDoList (restricted access)
Line 21: Line 33:
[[GismoRun4|Go to the 4th run Wiki page]] [[GismoRun4|Go to the 4th run Wiki page]] (restricted access, please send an email to SL to obtain the login information)

GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the IRAM 30m telescope

This page is maintained by CK, SL, and the GISMO team


People

  • Overall coordinator: Samuel Leclercq <leclercq@iram.fr> (IRAM/Grenoble)

  • GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs

  • Main contact IRAM/Granada: Carsten Kramer (station manager)

Publications

  1. Dwek, Staguhn et al. 2011

  2. Arendt et al. 2011

  3. [[http://arxiv.org/abs/1101.3586|Capack et al. 2011]

  4. Dicker et al. 2009

Things to do for 1st open run


4th test run, April 2011

Go to the 4th run Wiki page (restricted access, please send an email to SL to obtain the login information)

3rd test run, April 2010

Go to the 3rd run Wiki page

2nd test run, October 2008

Go to the 2nd run Wiki page

1st test run, November 2007

Go to the 1st run Wiki page

GoddardIramSuperconductingTwoMillimeterCamera (last edited 2014-03-31 13:30:45 by gra-lx17)