Differences between revisions 7 and 97 (spanning 90 versions)
Revision 7 as of 2008-10-27 23:44:15
Size: 1911
Editor: visitor11
Comment:
Revision 97 as of 2011-06-22 11:37:03
Size: 1348
Editor: lt-ck
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
'''GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer tested at the IRAM 30m observatory''' #acl GismoTeam:read,write,delete Default
=
GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the IRAM 30m telescope =
Line 3: Line 4:
In October 2008, the GISMO team Johannes Staguhn, Stephen Maher, Elmer Sharp, Dale Fixsen, and Dominic Benford spent two weeks at the 30m observatory to first install their GISMO bolometer in the lab and then in the receiver cabin to test its performance on the sky. GISMO consists of 8x16 pixels with transition edge sensors (TES). The super conducting TES are read out by SQUID multiplexers. The nominal bandwidth is 125-175GHz, pixels are spaced by 14", the telescope HPBW is 17" at 2mm. Data are taken while the telescope is performing Lissajour scan patterns without switching the secondary to increase the mapping efficiency. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files, being triggered byh the IRAM messaging system. Data are then further reduced using the Goddard data reduction package. This page is maintained by CK, SL, and the GISMO team
Line 5: Line 6:
The 2mm spectral range provides a unique terrestrial window enabling ground-based observations of the earliest active dusty galaxies in the universe and thereby allowing a better constraint on the star formation rate in these objects. Preliminary results from this second observing run at the 30m telescope look very promising. <<Anchor(beginOfPage)>>
Line 7: Line 8:
attachment:gismo-team.png [[BR]]
The GISMO team in the control room at the 30m telescope, after one week of 24 hours observing time. From left to right:
Stephen Maher, Elmer Sharp, Johannes Staguhn, Dale Fixsen, Dominic Benford (Photo by A.Sievers on October, 27, 2008)
   
<<TableOfContents(5)>>
Line 12: Line 10:
   * attachment:SPIE_GISMO_Staguhn.pdf
   * attachment:Staguhn_GISMO_SPIE_08_Rev1.pdf
   * [http://www.astro.umd.edu/people/staguhn.html Johannes Staguhn]
   * [http://gsfctechnology.gsfc.nasa.gov/Detector.htm (Goddard)],
   * [http://www.phys.ufl.edu/tes3/pdfs/Benford_TES_Bolometer_Arrays_Poster.pdf Poster on TES Bolometers]
----

== People ==

 * Overall coordinator: '''Samuel Leclercq''' <leclercq@iram.fr> (IRAM/Grenoble)
 * GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs
 * Main contact IRAM/Granada: Carsten Kramer (station manager)

== Publications ==
 
 1. [[http://arxiv.org/abs/1106.2092|Dwek, Staguhn et al. 2011]]
 1. [[http://arxiv.org/abs/1103.6225|Arendt et al. 2011]]
 1. [[http://arxiv.org/abs/1101.3586|Capack et al. 2011]]
 1. [[http://arxiv.org/abs/0907.1300|Dicker et al. 2009]]

== Things to do for 1st open run ==

 * ToDoList (restricted access)

----

== 4th test run, April 2011 ==

[[GismoRun4|Go to the 4th run Wiki page]] (restricted access, please send an email to SL to obtain the login information)

== 3rd test run, April 2010 ==

[[GismoRun3|Go to the 3rd run Wiki page]]

== 2nd test run, October 2008 ==

[[GismoRun2|Go to the 2nd run Wiki page]]

== 1st test run, November 2007 ==

[[GismoRun1|Go to the 1st run Wiki page]]

GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the IRAM 30m telescope

This page is maintained by CK, SL, and the GISMO team


People

  • Overall coordinator: Samuel Leclercq <leclercq@iram.fr> (IRAM/Grenoble)

  • GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs

  • Main contact IRAM/Granada: Carsten Kramer (station manager)

Publications

  1. Dwek, Staguhn et al. 2011

  2. Arendt et al. 2011

  3. Capack et al. 2011

  4. Dicker et al. 2009

Things to do for 1st open run


4th test run, April 2011

Go to the 4th run Wiki page (restricted access, please send an email to SL to obtain the login information)

3rd test run, April 2010

Go to the 3rd run Wiki page

2nd test run, October 2008

Go to the 2nd run Wiki page

1st test run, November 2007

Go to the 1st run Wiki page

GoddardIramSuperconductingTwoMillimeterCamera (last edited 2014-03-31 13:30:45 by gra-lx17)