Differences between revisions 6 and 26 (spanning 20 versions)
Revision 6 as of 2008-10-27 23:36:58
Size: 1470
Editor: visitor11
Comment:
Revision 26 as of 2010-04-07 14:16:52
Size: 6020
Editor: GismoTeam
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
'''GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer tested at the IRAM 30m observatory''' = GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer =
Line 3: Line 3:
In October 2008, the GISMO team Johannes Staguhn, Stephen Maher, Elmer Sharp, Dale Fixsen, and Dominic Benford spent two weeks at the 30m observatory to first install their GISMO bolometer in the lab and then in the receiver cabin to test its performance on the sky. GISMO consists of 8x16 pixels with transition edge sensors (TES). The nominal bandwidth is 125-175GHz, pixels are spaced by 14", the telescope HPBW is 17" at 2mm. This page is maintained by CK, SL, and the GISMO team

<<Anchor(beginOfPage)>>

<<TableOfContents(5)>>


== 3rd GISMO test run, April 2010 ==

=== Staffing of the test run ===

 * GSFC: J. Staguhn, D. Fixsen, A. Kovacs, S. Maher, E. Sharp, D. Benford
 * IRAM: S. Leclercq, A. Sievers, G. Quintana-Lacaci, R. Zylka

=== Test run schedule: 31.03. - 16.04.2010 ===

'''IRAM 30m schedule page: ''' [[http://www.iram.fr/IRAMFR/PV/sche/sche.html|Schedule]]

'''T16-09''' in 30m schedule = GISMO has telescope time


|| '''#''' || '''Dates''' || '''Main Task''' || '''Details''' || '''Lead (GSFC/IRAM)''' || '''Support''' ||
|| || 31.03. Wednesday || || Arrival of ES, first GISMO visitor, in Granada || || ||
|| || 01.04.-05.04. || Mount upgrades, close and cool down in the 30m workshop || Arrival of SM || || ||
|| || 06.04. Tuesday || Turn on GISMO, and 1st tests in the 30m workshop || Arrival of JS, DF, AK, SL, AS. || Johannes / Samuel || Albrecht (AoD) ||
|| || 07.04.-08.04. || Tests in the 30m workshop || Bias, Tuning, IV curves, internal LED, Computer... || Johannes / Samuel || Albrecht (AoD) ||
|| || 09.04. Friday || Installation in the cabin, cool down, alignment, background noise || Arrival of RZ || Johannes / Samuel || Albrecht & Guillermo (AoD) ||
|| || 10.04.-12.04. || Calibration on sky (alignment, pointing, focus, dips), observations '''T16-09''' || 12.04.: Arrival of DB, departure of AS, SL, RZ || Johannes / Samuel || Guillermo (AoD) ||
|| || 13.04.-15.04 || Observations '''T16-09'''|| || Johannes || Guillermo (AoD) ||
|| || 16.04. Friday || Dismounting || Departure of everybody || Johannes || Guillermo (AoD) ||


=== GISMO upgrades compared to previous runs ===

 * 2 motorized neutral density filters allowing to compensate the restrained dynamic range of GISMO by reducing the optical transmission by 20% plus/or 50% in case of poor weather conditions.
 * A controllable shutter and a LED coupled to detectors through a fiber allowing to make optical internal calibration
 * Automated observing procedures usable via a dedicated GUI such as detector tunning, sky dips, I-V measurements for total power measurements
 * A reduction package (Crush) allowing near-to-real-time data processing
 * An observer's manual

=== Daily reports ===

==== 31.03. - 05.04. ====

Arrival of Elmer & Stephen. Mount GISMO in the 30m workshop. The pictures below show several elements of the optical stage of GISMO: the 4K motors controling the neutral density filters (NDF), the neutral density filters in motion, the baffle with the NDF motors and the 3He sorption cooler, the connector box, and a general view of GISMO mounted.

Install the GISMO frame in th cabin, but keep everything else (GISMO & electronics) in the workshop.
 ||{{attachment:GISMO_4K_NDfilters_motors.jpg}} {{attachment:GISMO_NDfilter_1_moves.jpg}} {{attachment:GISMO_NDfilter_1_in_place.jpg}} {{attachment:GISMO_NDfilter_2_moves.jpg}} {{attachment:GISMO_baffle_3He_cooler.jpg}} {{attachment:GISMO_mounted.jpg}}||

Start cooling down GISMO on the 05.04.

==== 06.04. & 07.04. ====

Arrival of Johannes, Dale, Attila, Samuel. GISMO is cold. Turn on the instrument, BIAS the SQUIDs, monitor the TESs responses, take IV curves: all 4 quadrants are working, about ~20 non-responsive pixels (mostly due to SQUID issues in the MUX). LED illumination not visible in the real time data, but appears finely in reduced curves. Problems of strange wiggles in the IV curves. Sleep on it.
Find next morning that the problem was surely due to a hard-drive misbehavior due to a power supply failure. After replacement things looks fine, frequency plots show 1/f^2 noise certainly due to thermal oscillations. So far so good.


----

== 2nd GISMO Test run, October 2008 ==

In October 2008, the GISMO team Johannes Staguhn, Stephen Maher, Elmer Sharp, Dale Fixsen, and Dominic Benford spent two weeks at the 30m observatory to first install their GISMO bolometer in the lab and then in the receiver cabin to test its performance on the sky. GISMO consists of 8x16 pixels with transition edge sensors (TES). The super conducting TES are read out by SQUID multiplexers. The nominal bandwidth is 125-175GHz, pixels are spaced by 14", the telescope HPBW is 17" at 2mm. Data are taken while the telescope is performing Lissajous scan patterns, without switching the secondary, to increase the mapping efficiency. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files, being triggered by the IRAM messaging system. Data are then further reduced using the Goddard data reduction package.
Line 7: Line 68:
[http://www.astro.umd.edu/people/staguhn.html Johannes Staguhn] [http://gsfctechnology.gsfc.nasa.gov/Detector.htm (Goddard)], [http://www.phys.ufl.edu/tes3/pdfs/Benford_TES_Bolometer_Arrays_Poster.pdf Poster on TES Bolometers] (CK, 28-Oct-2008)
Line 9: Line 70:
attachment:gismo-team.png [[BR]] {{attachment:gismo-team.png}} <<BR>>
Line 13: Line 74:
   * [[http://esoads.eso.org/abs/2008JLTP..151..709S|Staguhn et al. 2008]] GISMO, a 2 mm Bolometer Camera Optimized for the Study of High Redshift Galaxies
   * [[attachment:SPIE_GISMO_Staguhn.pdf]]
   * [[attachment:Staguhn_GISMO_SPIE_08_Rev1.pdf]]
   * [[http://www.astro.umd.edu/people/staguhn.html|Johannes Staguhn]]
   * [[http://gsfctechnology.gsfc.nasa.gov/Detector.htm|(Goddard)]],
   * [[http://www.phys.ufl.edu/tes3/pdfs/Benford_TES_Bolometer_Arrays_Poster.pdf|Poster on TES Bolometers]]
   * [[http://www.submm.caltech.edu/~sharc/crush/index.htm|Crush]]
Line 14: Line 82:
   * attachment:SPIE_GISMO_Staguhn.pdf
   * attachment:Staguhn_GISMO_SPIE_08_Rev1.pdf
----

== 1st GISMO Test run, November 2007 ==

GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer

This page is maintained by CK, SL, and the GISMO team

3rd GISMO test run, April 2010

Staffing of the test run

  • GSFC: J. Staguhn, D. Fixsen, A. Kovacs, S. Maher, E. Sharp, D. Benford
  • IRAM: S. Leclercq, A. Sievers, G. Quintana-Lacaci, R. Zylka

Test run schedule: 31.03. - 16.04.2010

IRAM 30m schedule page: Schedule

T16-09 in 30m schedule = GISMO has telescope time

#

Dates

Main Task

Details

Lead (GSFC/IRAM)

Support

31.03. Wednesday

Arrival of ES, first GISMO visitor, in Granada

01.04.-05.04.

Mount upgrades, close and cool down in the 30m workshop

Arrival of SM

06.04. Tuesday

Turn on GISMO, and 1st tests in the 30m workshop

Arrival of JS, DF, AK, SL, AS.

Johannes / Samuel

Albrecht (AoD)

07.04.-08.04.

Tests in the 30m workshop

Bias, Tuning, IV curves, internal LED, Computer...

Johannes / Samuel

Albrecht (AoD)

09.04. Friday

Installation in the cabin, cool down, alignment, background noise

Arrival of RZ

Johannes / Samuel

Albrecht & Guillermo (AoD)

10.04.-12.04.

Calibration on sky (alignment, pointing, focus, dips), observations T16-09

12.04.: Arrival of DB, departure of AS, SL, RZ

Johannes / Samuel

Guillermo (AoD)

13.04.-15.04

Observations T16-09

Johannes

Guillermo (AoD)

16.04. Friday

Dismounting

Departure of everybody

Johannes

Guillermo (AoD)

GISMO upgrades compared to previous runs

  • 2 motorized neutral density filters allowing to compensate the restrained dynamic range of GISMO by reducing the optical transmission by 20% plus/or 50% in case of poor weather conditions.
  • A controllable shutter and a LED coupled to detectors through a fiber allowing to make optical internal calibration
  • Automated observing procedures usable via a dedicated GUI such as detector tunning, sky dips, I-V measurements for total power measurements
  • A reduction package (Crush) allowing near-to-real-time data processing
  • An observer's manual

Daily reports

31.03. - 05.04.

Arrival of Elmer & Stephen. Mount GISMO in the 30m workshop. The pictures below show several elements of the optical stage of GISMO: the 4K motors controling the neutral density filters (NDF), the neutral density filters in motion, the baffle with the NDF motors and the 3He sorption cooler, the connector box, and a general view of GISMO mounted.

Install the GISMO frame in th cabin, but keep everything else (GISMO & electronics) in the workshop.

  • GISMO_4K_NDfilters_motors.jpg GISMO_NDfilter_1_moves.jpg GISMO_NDfilter_1_in_place.jpg GISMO_NDfilter_2_moves.jpg GISMO_baffle_3He_cooler.jpg GISMO_mounted.jpg

Start cooling down GISMO on the 05.04.

06.04. & 07.04.

Arrival of Johannes, Dale, Attila, Samuel. GISMO is cold. Turn on the instrument, BIAS the SQUIDs, monitor the TESs responses, take IV curves: all 4 quadrants are working, about ~20 non-responsive pixels (mostly due to SQUID issues in the MUX). LED illumination not visible in the real time data, but appears finely in reduced curves. Problems of strange wiggles in the IV curves. Sleep on it. Find next morning that the problem was surely due to a hard-drive misbehavior due to a power supply failure. After replacement things looks fine, frequency plots show 1/f^2 noise certainly due to thermal oscillations. So far so good.


2nd GISMO Test run, October 2008

In October 2008, the GISMO team Johannes Staguhn, Stephen Maher, Elmer Sharp, Dale Fixsen, and Dominic Benford spent two weeks at the 30m observatory to first install their GISMO bolometer in the lab and then in the receiver cabin to test its performance on the sky. GISMO consists of 8x16 pixels with transition edge sensors (TES). The super conducting TES are read out by SQUID multiplexers. The nominal bandwidth is 125-175GHz, pixels are spaced by 14", the telescope HPBW is 17" at 2mm. Data are taken while the telescope is performing Lissajous scan patterns, without switching the secondary, to increase the mapping efficiency. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files, being triggered by the IRAM messaging system. Data are then further reduced using the Goddard data reduction package.

The 2mm spectral range provides a unique terrestrial window enabling ground-based observations of the earliest active dusty galaxies in the universe and thereby allowing a better constraint on the star formation rate in these objects. Preliminary results from this second observing run at the 30m telescope look very promising.

(CK, 28-Oct-2008)

gismo-team.png
The GISMO team in the control room at the 30m telescope, after one week of 24 hours observing time. From left to right: Stephen Maher, Elmer Sharp, Johannes Staguhn, Dale Fixsen, Dominic Benford (Photo by A.Sievers on October, 27, 2008)


1st GISMO Test run, November 2007

GoddardIramSuperconductingTwoMillimeterCamera (last edited 2014-03-31 13:30:45 by gra-lx17)