Size: 857
Comment:
|
Size: 1062
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
'''GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer''' | #acl GismoTeam:read,write,delete Default = GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the IRAM 30m telescope = |
Line 3: | Line 4: |
This 8x16 BUG 2mm bolometer camera has been tested at the 30m telescope in November 2007 and in October 2008. The bandwidth is 125-175GHz, the HPBW is about 17", pixels are offset by 14". PI is [http://www.astro.umd.edu/people/staguhn.html Johannes Staguhn] [http://gsfctechnology.gsfc.nasa.gov/Detector.htm (Goddard)], [http://www.phys.ufl.edu/tes3/pdfs/Benford_TES_Bolometer_Arrays_Poster.pdf Poster on TES Bolometers] | This page is maintained by CK, SL, and the GISMO team |
Line 5: | Line 6: |
attachment:gismo-team.png The GISMO team in the control room at the 30m telescope, after one week of 24 hours observing time. From left to right: Elmer Sharp, Stephen Maher, Johannes Staguhn, Dale Fixsen, Dominic Benford (Photo by A.Sievers on October, 27, 2008) |
<<Anchor(beginOfPage)>> |
Line 10: | Line 8: |
* attachment:SPIE_GISMO_Staguhn.pdf * attachment:Staguhn_GISMO_SPIE_08_Rev1.pdf |
<<TableOfContents(5)>> ---- == People == * Overall coordinator: '''Samuel Leclercq''' <leclercq@iram.fr> (IRAM/Grenoble) * GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs * Main contact IRAM/Granada: Carsten Kramer (station manager) == to do list == * ToDoList (restricted access) ---- == 4th test run, April 2011 == [[GismoRun4|Go to the 4th run Wiki page]] (restricted access, please send an email to SL to obtain the login information) == 3rd test run, April 2010 == [[GismoRun3|Go to the 3rd run Wiki page]] == 2nd test run, October 2008 == [[GismoRun2|Go to the 2nd run Wiki page]] == 1st test run, November 2007 == [[GismoRun1|Go to the 1st run Wiki page]] |
GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the IRAM 30m telescope
This page is maintained by CK, SL, and the GISMO team
Contents
People
Overall coordinator: Samuel Leclercq <leclercq@iram.fr> (IRAM/Grenoble)
GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs
- Main contact IRAM/Granada: Carsten Kramer (station manager)
to do list
ToDoList (restricted access)
4th test run, April 2011
Go to the 4th run Wiki page (restricted access, please send an email to SL to obtain the login information)
3rd test run, April 2010
2nd test run, October 2008