Size: 857
Comment:
|
Size: 855
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
'''GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer''' | = GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the 30m telescope = |
Line 3: | Line 3: |
This 8x16 BUG 2mm bolometer camera has been tested at the 30m telescope in November 2007 and in October 2008. The bandwidth is 125-175GHz, the HPBW is about 17", pixels are offset by 14". PI is [http://www.astro.umd.edu/people/staguhn.html Johannes Staguhn] [http://gsfctechnology.gsfc.nasa.gov/Detector.htm (Goddard)], [http://www.phys.ufl.edu/tes3/pdfs/Benford_TES_Bolometer_Arrays_Poster.pdf Poster on TES Bolometers] | This page is maintained by CK, SL, and the GISMO team |
Line 5: | Line 5: |
attachment:gismo-team.png The GISMO team in the control room at the 30m telescope, after one week of 24 hours observing time. From left to right: Elmer Sharp, Stephen Maher, Johannes Staguhn, Dale Fixsen, Dominic Benford (Photo by A.Sievers on October, 27, 2008) |
<<Anchor(beginOfPage)>> |
Line 10: | Line 7: |
* attachment:SPIE_GISMO_Staguhn.pdf * attachment:Staguhn_GISMO_SPIE_08_Rev1.pdf |
<<TableOfContents(5)>> ---- == People == * GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs * Overall coordinator: Samuel Leclercq (IRAM/Grenoble) * Main contact IRAM/Granada: Carsten Kramer (station manager) ---- == 4th test run, April 2011 == [[GismoRun4|Go to the 4th run Wiki page]] == 3rd test run, April 2010 == [[GismoRun3|Go to the 3rd run Wiki page]] == 2nd test run, October 2008 == [[GismoRun2|Go to the 2nd run Wiki page]] == 1st test run, November 2007 == [[GismoRun1|Go to the 1st run Wiki page]] |
GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the 30m telescope
This page is maintained by CK, SL, and the GISMO team
Contents
People
GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs
- Overall coordinator: Samuel Leclercq (IRAM/Grenoble)
- Main contact IRAM/Granada: Carsten Kramer (station manager)
4th test run, April 2011
3rd test run, April 2010
2nd test run, October 2008