Differences between revisions 3 and 81 (spanning 78 versions)
Revision 3 as of 2008-10-27 22:45:44
Size: 857
Editor: visitor11
Comment:
Revision 81 as of 2011-04-08 10:06:14
Size: 855
Editor: GismoTeam
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
'''GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer''' = GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the 30m telescope =
Line 3: Line 3:
This 8x16 BUG 2mm bolometer camera has been tested at the 30m telescope in November 2007 and in October 2008. The bandwidth is 125-175GHz, the HPBW is about 17", pixels are offset by 14". PI is [http://www.astro.umd.edu/people/staguhn.html Johannes Staguhn] [http://gsfctechnology.gsfc.nasa.gov/Detector.htm (Goddard)], [http://www.phys.ufl.edu/tes3/pdfs/Benford_TES_Bolometer_Arrays_Poster.pdf Poster on TES Bolometers] This page is maintained by CK, SL, and the GISMO team
Line 5: Line 5:
attachment:gismo-team.png
The GISMO team in the control room at the 30m telescope, after one week of 24 hours observing time. From left to right:
Elmer Sharp, Stephen Maher, Johannes Staguhn, Dale Fixsen, Dominic Benford (Photo by A.Sievers on October, 27, 2008)
   
<<Anchor(beginOfPage)>>
Line 10: Line 7:
   * attachment:SPIE_GISMO_Staguhn.pdf
   * attachment:Staguhn_GISMO_SPIE_08_Rev1.pdf
<<TableOfContents(5)>>

----

== People ==

 * GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs
 * Overall coordinator: Samuel Leclercq (IRAM/Grenoble)
 * Main contact IRAM/Granada: Carsten Kramer (station manager)
 
----

== 4th test run, April 2011 ==

[[GismoRun4|Go to the 4th run Wiki page]]

== 3rd test run, April 2010 ==

[[GismoRun3|Go to the 3rd run Wiki page]]

== 2nd test run, October 2008 ==

[[GismoRun2|Go to the 2nd run Wiki page]]

== 1st test run, November 2007 ==

[[GismoRun1|Go to the 1st run Wiki page]]

GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the 30m telescope

This page is maintained by CK, SL, and the GISMO team


People

  • GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs

  • Overall coordinator: Samuel Leclercq (IRAM/Grenoble)
  • Main contact IRAM/Granada: Carsten Kramer (station manager)


4th test run, April 2011

Go to the 4th run Wiki page

3rd test run, April 2010

Go to the 3rd run Wiki page

2nd test run, October 2008

Go to the 2nd run Wiki page

1st test run, November 2007

Go to the 1st run Wiki page

GoddardIramSuperconductingTwoMillimeterCamera (last edited 2014-03-31 13:30:45 by gra-lx17)