Differences between revisions 247 and 302 (spanning 55 versions)
Revision 247 as of 2013-04-14 10:54:25
Size: 7301
Editor: lt-ck
Comment:
Revision 302 as of 2013-10-27 14:23:43
Size: 9326
Editor: mrt-lx20
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
#acl GismoTeam,NicolasBillot:read,write,delete Default #acl GismoTeam,NicolasBillot,hermelo:read,write,delete,revert,admin Default
Line 8: Line 8:
<<TableOfContents(5)>> <<TableOfContents(2)>>
Line 14: Line 14:
|| || Pixels || '''Wavelength''' || '''Bandwidth''' || '''Sensitivity''' || '''HPBW''' || '''Field-of-View''' || '''Spacing''' ||
|| || || mm || '''[GHz]''' || '''[mJy sqrt(s)''' || || ||
||
||GISMO    || 8x16 || 2      || 140-162         || 10 || 16.7" || 1.8'x3.7' || 13.75" ||

The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. It has been build by Goddard Space Flight Center, in Greenbelt, Maryland under the lead of Johannes Staguhn. GISMO consists of '''8x16 pixels''' with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. The nominal bandwidth is 140-162 GHz (FWHM), pixels are spaced by '''13.75"''', the telescope HPBW is '''16.7"'''. The sensitivity has improved relative to the April 2011 run to about '''10 mJy sqrt(sec)''' (cf. report below). The field-of-view is ''' 1.8'x3.7' '''. Two standard observing modes are offered, Lissajous curves and on-the-fly scans. Both work in total power, without switching the secondary. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files which are automatically processed by the reduction software crush to create logs, pointing results, and a first quick view of the data. Typical overheads for single science targets on the sky are 60%. The relative flux stability is about 8% (cf. report below).

----

== Call for proposals for the summer semester 2013 ==
|| || '''Pixels''' || '''Wavelength''' || '''Bandwidth (FWHM)''' || '''Sensitivity (out of atmosphere)''' || '''HPBW''' || '''Field-of-View''' || '''Spacing''' ||
||GISMO since 2012 || 8x16 || 2.0 mm || 140-162 GHz || 14 mJy*s^1/2^ || 16.7" || 1.8' x 3.7' || 13.75" ||

The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. It has been build by Goddard Space Flight Center, in Greenbelt, Maryland under the lead of Johannes Staguhn. GISMO consists of '''8x16 pixels''' with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. The nominal bandwidth is 140-162 GHz (FWHM), pixels are spaced by '''13.75"''', the telescope HPBW is '''16.7"'''. The sensitivity has improved relative to the April 2011 run to a media value of about '''14 mJy sqrt(sec)''' (cf. reports below). The field-of-view is ''' 1.8'x3.7' '''. Two standard observing modes are offered, Lissajous curves and on-the-fly scans. Both work in total power, without switching the secondary. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files which are automatically processed by the reduction software crush to create logs, pointing results, and a first quick view of the data. Typical overheads for single science targets on the sky are 60%. The relative flux stability is about 8% (cf. report below).

----

== Call for proposals for the winter semester 2013/14 ==
Line 27: Line 26:
 * [[attachment:TimeEstimator_v2.pdf|Updated guidelines to estimate observing times (Billot et al. 2012)]].  * [[attachment:TimeEstimator_v3.pdf|Updated guidelines to estimate observing times (Billot et al. 2013)]].
 * [[attachment:3rdGISMOpool_public_v2.pdf|Report on GISMO performance based on the pool run in April-2013 (Hermelo et al. 2013)]].
Line 29: Line 29:
 * [[http://www.submm.caltech.edu/~sharc/crush/|crush]] data processing software will be used to reduce all data.


----
Line 34: Line 35:
 * [[attachment:GISMOSoftwareOperationalManual-Apr2013.pdf|GISMO Software Operational Manual]] by Steve Maher and Johannes Staguhn, April 2013  * [[attachment:GISMO Software Operational Manual - May 2013]] by Steve Maher and Johannes Staguhn, May 2013
Line 38: Line 39:
----
Line 70: Line 71:

== Observing Runs ==



=== April 2013 - 3rd pool run ===

== Observations ==


=== How to observe ===

The [[http://www.iram.es/IRAMES/mainWiki/GISMOforDummies | Quick GISMO guide for dummies]] provides examples and explanations about how to start !PaKo in order to run the telescope with GISMO, and about total power maps using Lissajous and On-the-fly patterns. Observations using the wobbler will not be offered for this run.

## [[http://www.iram.es/IRAMES/mainWiki/GismoObservingScripts | GismoObservingScripts ]]
## The old page GismoHowToObserve is obsolete.
## [[https://www.iram.es/IRAMES/mainWiki/GismoPakoNotes|Notes on paKo and NCS for GISMO 2012]]

=== Pointing Sources ===

[[http://www.iram.es/IRAMES/FluxMonitoring/PointingSources/plotPointingSources.html|Plots for Pointing Sources]] can be accessed within the IRAM network. These data are provided ONLY to help in the planning of observations, in particular to select pointing and focus sources at the IRAM 30-m telescope. They should not be used for any other purpose.


=== Data reduction ===

GISMO data are reduced using CRUSH (Comprehensive Reduction Utility for SHARC2 - and more).

 * [[http://www.submm.caltech.edu/~sharc/crush/ | CRUSH website]]
 * [[http://www.submm.caltech.edu/~sharc/crush/download.html | Download CRUSH]]
 * [[http://www.iram.es/IRAMES/mainWiki/CrushExamples | Quick introduction to CRUSH]]

----

== 4th GISMO pool (October/November 2013) ==

The 4th GISMO pool will take place from the 22nd of October to the 5th of November 2013.
Observations will be carried from a dedicated pool account (I. Hermelo will provide login information).

=== Pool projects and observers ===

For information about the accepted projects and the observers at the 30m please go to:

 * [[http://www.iram.es/IRAMES/mainWiki/ProjectsPoolS13 | List of accepted projects.]]

 * [[http://www.iram.es/IRAMES/mainWiki/PoolS13 | Pool observers for the October/November 2013 run]]

 * [[http://www.iram.es/IRAMES/mainWiki/GISMO/4thPool/Rooms | Room occupancy.]]


=== Progress ===

The progress of the 4th GISMO pool can be followed via:

 * [[https://pools.iram.es | Pool data base]]
 * [[https://herapool.iram.es/GISMO/|External GISMO Nexus log]] with slow updates
 * [[https://mrt-lx1/Devices/GISMO/|Internal GISMO Nexus log]] with fast updates

=== Status ===

 * ''' 2013.09.27 11:00 UT:''' Starting the observations. TAU(225GHz)~0.5
 * ''' 2013.09.25 21:00 UT:''' The wind died down but it started to rain.
 * ''' 2013.09.24 23:00 UT:''' Stopped by strong wind. TAU(225GHz)~0.6
 * ''' 2013.09.23 09:00 UT:''' Bad weather conditions. Testing new scripts on Mars
 * ''' 2013.09.22 14:00 UT:''' Stopped by bad weather conditions (strong wind and rain)


----

== Previous observing runs ==

=== 3rd GISMO pool (April 2013) ===
Line 89: Line 146:
 * GISMO NEXUS log
   * [[https://mrt-lx1/Devices/GISMO/|internal with fast updates]]
   * [[https://herapool.iram.es/GISMO/|external with slow updates]]



==== Observing scripts ====

 * GismoObservingScripts provides examples and explanations about how to start !PaKo in order to run the telescope with GISMO, and about total power maps using Lissajous and On-the-fly patterns. Observations using the wobbler will not be offered for this run. The old page GismoHowToObserve is obsolete.

 * [[https://www.iram.es/IRAMES/mainWiki/GismoPakoNotes|Notes on paKo and NCS for GISMO 2012]]








=== November 2012 - 2nd pool run ===


=== 2nd GISMO pool (November 2012) ===
Line 129: Line 169:







=== April 2012 - 1st pool run ===
=== 1st GISMO pool (April 2012) ===
Line 150: Line 183:
----

=== Test runs 2007-2012 ===

=
=== 5th alignment run, March 2012 ====

=== 5th alignment run, March 2012 ===
Line 158: Line 188:
==== 4th test run, April 2011 ==== === 4th test run, April 2011 ===
Line 162: Line 192:
==== 3rd test run, April 2010 ==== === 3rd test run, April 2010 ===
Line 166: Line 196:
==== 2nd test run, October 2008 ==== === 2nd test run, October 2008 ===
Line 170: Line 200:
==== 1st test run, November 2007 ==== === 1st test run, November 2007 ===

GISMO

This page is maintained by IH, CK, SL and the GISMO team


Overview

Pixels

Wavelength

Bandwidth (FWHM)

Sensitivity (out of atmosphere)

HPBW

Field-of-View

Spacing

GISMO since 2012

8x16

2.0 mm

140-162 GHz

14 mJy*s1/2

16.7"

1.8' x 3.7'

13.75"

The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. It has been build by Goddard Space Flight Center, in Greenbelt, Maryland under the lead of Johannes Staguhn. GISMO consists of 8x16 pixels with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. The nominal bandwidth is 140-162 GHz (FWHM), pixels are spaced by 13.75", the telescope HPBW is 16.7". The sensitivity has improved relative to the April 2011 run to a media value of about 14 mJy sqrt(sec) (cf. reports below). The field-of-view is 1.8'x3.7' . Two standard observing modes are offered, Lissajous curves and on-the-fly scans. Both work in total power, without switching the secondary. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files which are automatically processed by the reduction software crush to create logs, pointing results, and a first quick view of the data. Typical overheads for single science targets on the sky are 60%. The relative flux stability is about 8% (cf. report below).


Call for proposals for the winter semester 2013/14

GISMO is offered again to the community:


Documentation


Publications

  1. Dwek, Staguhn et al. 2011 ApJ,
    Star and dust formation activities in AzTEC-3: A starburst galaxy at z = 5.3

  2. Arendt et al. 2011 ApJ,
    The Radio - 2 mm Spectral Index of the Crab Nebula Measured with GISMO

  3. Capack et al. 2011 Nature,
    A massive proto-cluster of galaxies at a redshift of z~5.3

  4. Dicker et al. 2009 ApJ,
    90GHz and 150GHz observations of the Orion M42 region. A sub-millimeter to radio analysis

  5. Benford, Moseley, Zmuidzinas 2009 Journal of Physics
    Direct detectors for the Einstein inflation probe

  6. IRAM Newsletter 2/2009
    GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer tested at the IRAM 30m observatory

  7. Staguhn et al. 2008 Journal of Low Temperature Physics, 151, 3, 709
    GISMO, a 2 mm Bolometer Camera Optimized for the Study of High Redshift Galaxies


Support teams


Observations

How to observe

The Quick GISMO guide for dummies provides examples and explanations about how to start PaKo in order to run the telescope with GISMO, and about total power maps using Lissajous and On-the-fly patterns. Observations using the wobbler will not be offered for this run.

Pointing Sources

Plots for Pointing Sources can be accessed within the IRAM network. These data are provided ONLY to help in the planning of observations, in particular to select pointing and focus sources at the IRAM 30-m telescope. They should not be used for any other purpose.

Data reduction

GISMO data are reduced using CRUSH (Comprehensive Reduction Utility for SHARC2 - and more).


4th GISMO pool (October/November 2013)

The 4th GISMO pool will take place from the 22nd of October to the 5th of November 2013. Observations will be carried from a dedicated pool account (I. Hermelo will provide login information).

Pool projects and observers

For information about the accepted projects and the observers at the 30m please go to:

Progress

The progress of the 4th GISMO pool can be followed via:

Status

  • 2013.09.27 11:00 UT: Starting the observations. TAU(225GHz)~0.5

  • 2013.09.25 21:00 UT: The wind died down but it started to rain.

  • 2013.09.24 23:00 UT: Stopped by strong wind. TAU(225GHz)~0.6

  • 2013.09.23 09:00 UT: Bad weather conditions. Testing new scripts on Mars

  • 2013.09.22 14:00 UT: Stopped by bad weather conditions (strong wind and rain)


Previous observing runs

3rd GISMO pool (April 2013)

Pool projects and observers

2nd GISMO pool (November 2012)

Two weeks of dedicated GISMO observations have been carried out during November 2012.

Pool projects and observers

Daily reports

1st GISMO pool (April 2012)

In September 2011, GISMO had for the 1st time been offered to the community. Two weeks of dedicated GISMO observations have been carried out during April 2012.

Daily reports

Test plan

5th alignment run, March 2012

4th test run, April 2011

3rd test run, April 2010

2nd test run, October 2008

1st test run, November 2007

GoddardIramSuperconductingTwoMillimeterCamera (last edited 2014-03-31 13:30:45 by gra-lx17)