Differences between revisions 191 and 192
Revision 191 as of 2012-06-11 14:57:05
Size: 6350
Editor: dhcp-77
Comment:
Revision 192 as of 2012-07-19 14:41:28
Size: 5742
Editor: gra-lx17
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
This page is maintained by CK, SL, and the GISMO team This page is maintained by CK, SL, GB and the GISMO team
Line 14: Line 14:
The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. It has been build by Goddard Space Flight Center, in Greenbelt, Maryland under the lead of Johannes Staguhn. GISMO consists of '''8x16 pixels''' with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. . The nominal bandwidth is 140-162GHz (FWHM), pixels are spaced by '''13.75"''', the telescope HPBW is '''16.7"'''. The sensitivity is '''16 mJy sqrt(sec)''' per beam. The field-of-view is 1.8'x3.7'. In the standard observing mode, data are taken while the telescope follows Lissajous curves without switching the secondary. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files which are automatically processed by the reduction software crush to create logs, pointing results, and a first quick view of the data. The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. It has been build by Goddard Space Flight Center, in Greenbelt, Maryland under the lead of Johannes Staguhn. GISMO consists of '''8x16 pixels''' with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. The nominal bandwidth is 140-162 GHz (FWHM), pixels are spaced by '''13.75"''', the telescope HPBW is '''16.7"'''. The sensitivity is '''13 mJy sqrt(sec)''' per beam. The field-of-view is 1.8'x3.7'. In the standard observing mode, data are taken while the telescope follows Lissajous curves without switching the secondary. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files which are automatically processed by the reduction software crush to create logs, pointing results, and a first quick view of the data.
Line 20: Line 20:



Line 21: Line 25:





=== Call for proposals ===

GISMO will be offered to the community for the winter semester 2012.

 * Call for proposals (not yet available)
 * [[attachment:GISMO_TimeEstimator.pdf|Time estimator.]] This document contains guidelines for astronomers to compute observing time estimates.
 * [[http://www.submm.caltech.edu/~sharc/crush/|crush]] data processing software will be used to reduce all data.




Line 24: Line 45:
During the first open observing run in April 2012, observations will be carried out as pooled observations from a dedicated pool account gismo11. M.Gonzalez will provide login information. Progress of observations can be followed via the [[https://herapool.iram.es|pool data base]]. Summer semester 2012 observations will be carried out as pooled observations from a dedicated pool account. G.Bruni will provide login information. Progress of observations can be followed via the [[https://herapool.iram.es|pool data base]].
Line 26: Line 47:
 * GismoObservingScripts for the April 2012 run providing samples and explanations about how to start !PaKo in order to run the telescope with GISMO, and about total power maps using Lissajous and On-the-fly patterns. Observations using the wobbler will not be offered for this run. The old page GismoHowToObserve is obsolete.  * GismoObservingScripts provides examples and explanations about how to start !PaKo in order to run the telescope with GISMO, and about total power maps using Lissajous and On-the-fly patterns. Observations using the wobbler will not be offered for this run. The old page GismoHowToObserve is obsolete.
Line 30: Line 51:
 * [[http://www.iram.es/IRAMES/mainWiki/PoolW11|Pool observers in April 2012]]  * [[attachment:GISMOSoftwareOperationalManual23apr2012.pdf]]
Line 32: Line 53:
 * GISMO observing schedule for the April 2012 run: The following is a preliminary schedule for the two weeks of GISMO pool in April. Please, note that this schedule is a '''VERY FIRST DRAFT ''', so the observations can be carried out in a very different way, depending on how GISMO is installed, the weather conditions, the needs of the GISMO team... Priority has been given to the A-rated projects. This schedule is ''' VERY SUSCEPTIBLE ''' to be modified again: '''[[attachment:GISMOscheduleApr2012.png]]'''  * GISMO observing schedule for the November 2012 run (not yet available)
Line 34: Line 55:
=== Call for proposals ===  * Pool observers for the November 2012 run (not yet available)
Line 36: Line 57:
In September 2011, GISMO had for the 1st time been offered to the community. Two weeks of dedicated GISMO observations are now planned for April 2012. GISMO will be available again for the summer semester 2012.
Line 38: Line 58:
 * [[http://www.iram-institute.org/EN/content-page-169-7-57-169-0-0.html|Call for proposals]].
 * [[attachment:GISMO_TimeEstimator.pdf|Time estimator.]] This document contains guidelines for astronomers to compute observing time estimates.
 * [[http://www.submm.caltech.edu/~sharc/crush/|crush]] data processing software will be used to reduce all data and [[http://www.submm.caltech.edu/~sharc/crush/|crush GISMO manual]].

Line 72: Line 91:
== Internal pages == == Old Runs ==
Line 74: Line 93:
=== Documentation ===
Line 76: Line 94:
 * [[attachment:GISMOSoftwareOperationalManual23apr2012.pdf]]
Line 79: Line 97:
In September 2011, GISMO had for the 1st time been offered to the community. Two weeks of dedicated GISMO observations have been carried out during April 2012.

GISMO

This page is maintained by CK, SL, GB and the GISMO team


Overview

The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. It has been build by Goddard Space Flight Center, in Greenbelt, Maryland under the lead of Johannes Staguhn. GISMO consists of 8x16 pixels with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. The nominal bandwidth is 140-162 GHz (FWHM), pixels are spaced by 13.75", the telescope HPBW is 16.7". The sensitivity is 13 mJy sqrt(sec) per beam. The field-of-view is 1.8'x3.7'. In the standard observing mode, data are taken while the telescope follows Lissajous curves without switching the secondary. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files which are automatically processed by the reduction software crush to create logs, pointing results, and a first quick view of the data.

The 2mm spectral range provides a unique terrestrial window enabling ground-based observations of the earliest active dusty galaxies in the universe and thereby allowing a better constraint on the star formation rate in these objects.


Documentation

Call for proposals

GISMO will be offered to the community for the winter semester 2012.

  • Call for proposals (not yet available)
  • Time estimator. This document contains guidelines for astronomers to compute observing time estimates.

  • crush data processing software will be used to reduce all data.

Science Observations

Summer semester 2012 observations will be carried out as pooled observations from a dedicated pool account. G.Bruni will provide login information. Progress of observations can be followed via the pool data base.

Publications

  1. Dwek, Staguhn et al. 2011 ApJ,
    Star and dust formation activities in AzTEC-3: A starburst galaxy at z = 5.3

  2. Arendt et al. 2011 ApJ,
    The Radio - 2 mm Spectral Index of the Crab Nebula Measured with GISMO

  3. Capack et al. 2011 Nature,
    A massive proto-cluster of galaxies at a redshift of z~5.3

  4. Dicker et al. 2009 ApJ,
    90GHz and 150GHz observations of the Orion M42 region. A sub-millimeter to radio analysis

  5. Benford, Moseley, Zmuidzinas 2009 Journal of Physics
    Direct detectors for the Einstein inflation probe

  6. IRAM Newsletter 2/2009
    GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer tested at the IRAM 30m observatory

  7. Staguhn et al. 2008 Journal of Low Temperature Physics, 151, 3, 709
    GISMO, a 2 mm Bolometer Camera Optimized for the Study of High Redshift Galaxies


Support teams


Old Runs

April 2012 1st pool run

In September 2011, GISMO had for the 1st time been offered to the community. Two weeks of dedicated GISMO observations have been carried out during April 2012.

Daily reports

Test plan


Test runs 2007-2012

5th alignment run, March 2012

4th test run, April 2011

3rd test run, April 2010

2nd test run, October 2008

1st test run, November 2007

GoddardIramSuperconductingTwoMillimeterCamera (last edited 2014-03-31 13:30:45 by gra-lx17)