Differences between revisions 114 and 115
Revision 114 as of 2011-06-28 12:52:28
Size: 3311
Editor: mrt-lx5
Comment:
Revision 115 as of 2011-06-28 12:53:09
Size: 3334
Editor: mrt-lx5
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. GISMO consists of '''8x16 pixels''' with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. . The nominal bandwidth is 125-175GHz, pixels are spaced by '''14"''', the telescope HPBW is '''16"'''. In the standard observing mode, data are taken while the telescope follows Lissajous curves without switching the secondary. An automated pipeline merged the GISMO data with the telescope data streams to create FITS files for further processing by [[http://www.submm.caltech.edu/~sharc/crush/|crush]]. The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. GISMO consists of '''8x16 pixels''' with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. . The nominal bandwidth is 125-175GHz, pixels are spaced by '''14"''', the telescope HPBW is '''16"'''. In the standard observing mode, data are taken while the telescope follows Lissajous curves without switching the secondary. An automated pipeline merged the GISMO data with the telescope data streams to create FITS files for further processing by the reduction software [[http://www.submm.caltech.edu/~sharc/crush/|crush]].

GISMO

This page is maintained by CK, SL, and the GISMO team

The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. GISMO consists of 8x16 pixels with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. . The nominal bandwidth is 125-175GHz, pixels are spaced by 14", the telescope HPBW is 16". In the standard observing mode, data are taken while the telescope follows Lissajous curves without switching the secondary. An automated pipeline merged the GISMO data with the telescope data streams to create FITS files for further processing by the reduction software crush.

The 2mm spectral range provides a unique terrestrial window enabling ground-based observations of the earliest active dusty galaxies in the universe and thereby allowing a better constraint on the star formation rate in these objects.


People

  • Overall coordinator: Samuel Leclercq <leclercq@iram.fr> (IRAM/Grenoble)

  • GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs

  • Main contact IRAM/Granada: Carsten Kramer (station manager)

Publications

  1. Dwek, Staguhn et al. 2011 ApJ,
    Star and dust formation activities in AzTEC-3: A starburst galaxy at z = 5.3

  2. Arendt et al. 2011 ApJ,
    The Radio - 2 mm Spectral Index of the Crab Nebula Measured with GISMO

  3. Capack et al. 2011 Nature,
    A massive proto-cluster of galaxies at a redshift of z~5.3

  4. Dicker et al. 2009 ApJ,
    90GHz and 150GHz observations of the Orion M42 region. A sub-millimeter to radio analysis

  5. http://iopscience.iop.org/1742-6596/155/1/012001/pdf/jpconf9_155_012001.pdf Journal of Physics
    Direct detectors

  6. Staguhn et al. 2008 Journal of Low Temperature Physics, 151, 3, 709
    GISMO, a 2 mm Bolometer Camera Optimized for the Study of High Redshift Galaxies

Other news:

  1. IRAM Newsletter 2/2009

  2. see also Samuel's list: here

Manuals

Things to do for 1st open run

HOWTO


Test runs

4th test run, April 2011

Go to the 4th run Wiki page (restricted access, please send an email to SL to obtain the login information)

3rd test run, April 2010

Go to the 3rd run Wiki page

2nd test run, October 2008

Go to the 2nd run Wiki page

1st test run, November 2007

Go to the 1st run Wiki page

GoddardIramSuperconductingTwoMillimeterCamera (last edited 2014-03-31 13:30:45 by gra-lx17)