Differences between revisions 1 and 81 (spanning 80 versions)
Revision 1 as of 2008-10-27 22:24:48
Size: 583
Editor: visitor11
Comment:
Revision 81 as of 2011-04-08 10:06:14
Size: 855
Editor: GismoTeam
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the 30m telescope =
Line 2: Line 3:
'''GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer''' This page is maintained by CK, SL, and the GISMO team
Line 4: Line 5:
   In November 2007, this 8x16 BUG bolometer camera was tested at the 30m telescope. Bandwidth 125-175GHz, 17" beam, 14" pixel offsets. A second test run is currently running (Oct 08). PI is [http://www.astro.umd.edu/people/staguhn.html Johannes Staguhn] [http://gsfctechnology.gsfc.nasa.gov/Detector.htm (Goddard)], [http://www.phys.ufl.edu/tes3/pdfs/Benford_TES_Bolometer_Arrays_Poster.pdf Poster on TES Bolometers] <<Anchor(beginOfPage)>>
Line 6: Line 7:
   * attachment:SPIE_GISMO_Staguhn.pdf
   * attachment:Staguhn_GISMO_SPIE_08_Rev1.pdf
<<TableOfContents(5)>>

----

== People ==

 * GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs
 * Overall coordinator: Samuel Leclercq (IRAM/Grenoble)
 * Main contact IRAM/Granada: Carsten Kramer (station manager)
 
----

== 4th test run, April 2011 ==

[[GismoRun4|Go to the 4th run Wiki page]]

== 3rd test run, April 2010 ==

[[GismoRun3|Go to the 3rd run Wiki page]]

== 2nd test run, October 2008 ==

[[GismoRun2|Go to the 2nd run Wiki page]]

== 1st test run, November 2007 ==

[[GismoRun1|Go to the 1st run Wiki page]]

GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the 30m telescope

This page is maintained by CK, SL, and the GISMO team


People

  • GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs

  • Overall coordinator: Samuel Leclercq (IRAM/Grenoble)
  • Main contact IRAM/Granada: Carsten Kramer (station manager)


4th test run, April 2011

Go to the 4th run Wiki page

3rd test run, April 2010

Go to the 3rd run Wiki page

2nd test run, October 2008

Go to the 2nd run Wiki page

1st test run, November 2007

Go to the 1st run Wiki page

GoddardIramSuperconductingTwoMillimeterCamera (last edited 2014-03-31 13:30:45 by gra-lx17)