Differences between revisions 3 and 5 (spanning 2 versions)
Revision 3 as of 2024-08-11 14:17:39
Size: 1031
Comment:
Revision 5 as of 2024-08-11 14:54:25
Size: 1089
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
=== Carry out verification tests of the 30 m telescope using NIKA2, after recoating of M1 === === Carry out verification and performance tests of the 30 m telescope using NIKA2, after recoating of M1 ===
Line 14: Line 14:
* Photometry and RMS check using flux calibrators * Photometry and RMS check using flux calibrators for estimating improvements
Line 22: Line 22:
* Night-time beam maps (~30 min each); possible targets to be used: 2251+158, Uranus, 0316+413 * NIKA2 beam maps (stable conditions, ~30 min each); possible targets to be used: 2251+158, Uranus, 0316+413

NIKA2 technical run #67 / August 2024

Back to the NIKA2 Run 67 main page

Goal

Carry out verification and performance tests of the 30 m telescope using NIKA2, after recoating of M1

Essential issues to be tested:

* Check the feasibility and correctness of NIKA2 observations in a first approach after the last stop

* Test day/night behaviour of the beams

* Photometry and RMS check using flux calibrators for estimating improvements

Observations required:

* Standard day/night point & focus sequences

* A good statistics of calibration scans on selected planets and secondary flux calibrators (see visibility plot)

* NIKA2 beam maps (stable conditions, ~30 min each); possible targets to be used: 2251+158, Uranus, 0316+413

* A new lateral focus session would be necessary (stable conditions, telescope relaxed; it takes about 3h)

Input documentation

  • Scripts and source files are located in the ~/pako/Scripts_30mCommissioning_2024/ folder of the t22 account.

Staff

IRAM staff

GoalsPrepStaffNika2TestRun67 (last edited 2024-08-11 22:01:19 by NikaBolometer)