=== Carry out verification tests of the 30 m telescope using NIKA2, after recoating of M1 === | === Carry out verification and performance tests of the 30 m telescope using NIKA2, after recoating of M1 === |
Line 8: | Line 8: |
Essential issues to be tested: | '''Essential issues to be tested:''' |
Line 11: | Line 11: |
Line 12: | Line 13: |
Line 14: | Line 16: |
Observations required: | '''Observations required:''' |
Line 17: | Line 19: |
Line 18: | Line 21: |
* Night-time beam maps (~30 min each); possible targets to be used: 2251+158, Uranus, 0316+413 | * NIKA2 beam maps (~30 min each); possible targets to be used: 2251+158, Uranus, 0316+413 |
NIKA2 technical run #67 / August 2024
Back to the NIKA2 Run 67 main page
Goal
Carry out verification and performance tests of the 30 m telescope using NIKA2, after recoating of M1
Essential issues to be tested:
* Check the feasibility and correctness of NIKA2 observations in a first approach after the last stop
* Test day/night behaviour of the beams
* Photometry and RMS check using flux calibrators
Observations required:
* Standard day/night point & focus sequences
* A good statistics of calibration scans on selected planets and secondary flux calibrators (see visibility plot)
* NIKA2 beam maps (~30 min each); possible targets to be used: 2251+158, Uranus, 0316+413
* A new lateral focus session would be necessary (stable conditions, telescope relaxed; it takes about 3h)
Input documentation
- Scripts and source files are located in the ~/pako/Scripts_30mCommissioning_2024/ folder of the t22 account.
Staff
IRAM staff