Differences between revisions 3 and 4
Revision 3 as of 2019-12-16 10:54:47
Size: 2569
Comment:
Revision 4 as of 2020-01-21 20:28:53
Size: 2531
Comment:
Deletions are marked like this. Additions are marked like this.
Line 28: Line 28:
||<rowbgcolor="#e5dd55"> People\Date ||21||22||23||24||T25|| 26|| 27|| 28|| 29|| 1|| 2|| T3|| ||<rowbgcolor="#e5dd55"> People\Date ||24||T25|| 26|| 27|| 28|| 29|| 1|| 2|| T3||
Line 30: Line 30:
||<rowbgcolor="#ddccff"> Name Surname. ||  || || || || || || || || || || || ||
||<rowbgcolor="#ddcc55"> People || 0|| 0|| 0|| 0|| 0 || 0 || 0 || 0 || 0 || 0 || 0 || 0 ||
||<rowbgcolor="#ddcc55"> Rooms at obs. || 0|| 0|| 0|| 0|| 0 || 0 || 0 || 0 || 0 || 0 || 0 || 0 ||
||<rowbgcolor="#ddccff"> Name Surname. || Anaelle || || || || || || || || ||
||<rowbgcolor="#ddcc55"> People ||  g|| 1 || 1 || 1 || 1 || 1 || 1 || 1 || 0 ||
||<rowbgcolor="#ddcc55"> Rooms at obs. ||  0|| 0 || 0 || 0 || 0 || 0 || 0 || 0 || 0 ||

NIKA2 technical run #42 / February 25th - March 3rd, 2020

Back to the NIKA2 Run 42 main page

Goals

Commissioning of polarimetry: final and conclusive run.

Before the run

DAQ v3 will be used in total power during the W19 4th science pool (Feb 11th-18th, 2020). The observations carried out in that week with the DAQ v3 will be only on science targets. The aim is to collect 3 full days of total power data with the DAQ v3, that will allow us to have enough statistics to finally conclude the validatation of DAQ v3. The data collected in those days will be not processed immediately

If the 4th science pool will not allow 3 full days of total power DAQ v3 testing, what is missing will be taken from this commissioning week (Feb 25th - Mar 3rd, 2020). Apart for this, run 42 is dedicated to polarimetry commissioning.

We need to make sure that the latest upgrades written by Juan Macias to the read-data library (fixing sync problems and other smaller modifications) are active, i.e. check with Juan if he has "committed"the latest version of the read-data library for DAQ v3.

Observers and Schedule

All the people who will participate to the run must appear in the table below; each one must inform Anaelle/Stefano/Samuel and contact Laura to reserve rooms in Granada and at the telescope. For those who travel on IRAM funds, contact Samuel; see also the NIKA2 travel rules.

Staff of the run in September 2019: table of the nights spent at the observatory for the NIKA2 collaboration members participating to the run (T = Tuesday, S = Saturday, 1 = night scheduled at the telescope, g = night in Granada office).

People\Date

24

T25

26

27

28

29

1

2

T3

Name Surname.

Anaelle

People

g

1

1

1

1

1

1

1

0

Rooms at obs.

0

0

0

0

0

0

0

0

0

AoD.

0

(*) For the rooms, count persons from the NIKA collaboration and Grenoble, but not from IRAM Granada.

IRAM's http://www.iram.es/IRAMES/mainWiki/AstronomersOnDutySchedule.

GoalsPrepStaffNika2TestRun42 (last edited 2020-02-25 11:23:49 by NikaBolometer)