Differences between revisions 7 and 8
Revision 7 as of 2018-09-14 14:22:21
Size: 3289
Comment:
Revision 8 as of 2018-09-14 14:26:38
Size: 3406
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:
- Commissioning of the NIKA2 polarimeter. - Get piic monitoring running if possible (! requires correct instrument parameters => beammap IMBFIT analyzed !)
Line 21: Line 21:
- Get data with external calibrator: at least few for debugging purpose, more to start commissioning with it if possible. - Commissioning of the NIKA2 polarimeter;
Line 23: Line 23:
- If available and if time: improved PIMP spectra. - Get data with external calibrator: at least few for debugging purpose, more to start commissioning with it if possible;

- If available and if time: improved PIMP spectra;

NIKA2 technical run 5-6 / 18-25 September 2018

Back to the NIKA2 Run 20 main page

5-6 of September - Goals:

- Commissioning of the new dichroic;

- Commissioning of the new acquisition software;

- Sanity check of the synchronization of the polarization system.

18-25 of September - Goals:

- Sanity check of the old dichroic and verification of the performances;

- Checking the stability of the new acquisition software;

- Get piic monitoring running if possible (! requires correct instrument parameters => beammap IMBFIT analyzed !)

- Commissioning of the NIKA2 polarimeter;

- Get data with external calibrator: at least few for debugging purpose, more to start commissioning with it if possible;

- If available and if time: improved PIMP spectra;

Observers and Schedule

All the people who will participate to the pool run must appear in the table below; each one must inform Samuel and contact Esther to reserve rooms in Granada and at the telescope. For those who travel on IRAM funds, Beatrice should be contacted; see the NIKA2 travel rules.

Staff of the run in September 2018: table of the nights spent at the observatory for the NIKA2 collaboration members participating to the run (T = Tuesday, S = Saturday, 1 = night scheduled at the telescope, g = night in Granada office).

People\Date

5

6

14

15

16

17

T18

19

20

21

22

23

24

T25

Alicia Gomez

0

0

0

0

0

g

1

1

1

1

1

1

1

0

Nicolas Ponthieu

0

0

1

1

1

1

1

1

1

1

1

1

1

0

JF Lestrade

0

0

0

0

0

g

1

1

1

1

1

1

1

0

Samuel Leclercq

0

0

0

0

0

g

1

1

1

1

1

1

1

0

Juan M. Perez

1

1

0

0

0

0

0

0

0

0

0

0

0

0

Yoshito

0

0

0

0

0

g

1

1

1

1

1

1

1

0

Martino Calvo

0

0

0

0

0

g

1

1

1

0

0

0

0

0

Aina Andrianasolo

0

0

1

1

1

1

1

1

1

1

1

1

1

0

People

0

0

2

2

2

2

7

7

7

6

6

6

6

0

Rooms at obs.

1

1

2

2

2

2

4

4

4

4

4

4

4

0

Alessia Ritacco

1

1

0

0

0

0

1

1

1

0

0

0

0

0

Bilal Ladjelate

1

1

0

0

0

0

0

0

0

1

1

1

1

0

(*) For the rooms, count persons from the NIKA collaboration and Grenoble, but not from IRAM Granada.

IRAM's http://www.iram.es/IRAMES/mainWiki/AstronomersOnDutySchedule.

GoalsPrepStaffNika2TestRun20 (last edited 2018-10-18 15:56:00 by NikaBolometer)