|
Size: 869
Comment:
|
Size: 1175
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 8: | Line 8: |
| * According to DJ, a new sweep is provided before the beginning of this Recommissioning week. We will proceed as usual: (i) point/focus with the old sweep, (ii) get beam maps with the new sweep, (iii) then observe with the old sweep until the new DAFs/Kidpars are ready (it usually takes few hours). | * According to DJ, a new sweep is provided before the beginning of this re-commissioning week. We will proceed as usual: (i) point/focus with the old sweep, (ii) get beam maps with the new sweep, (iii) then observe with the old sweep until the new DAFs/Kidpars are ready (it usually takes few hours). |
| Line 14: | Line 14: |
| = Notes for the next (run 80) re-commissioning campaign: = | = Notes for the next (run 80) re-commissioning campaign (under construction): = == Main Goals == * New sweep (run 80) * produce high-quality DAFs/RPPs and Kidpars * determine the optimal Z focus position and study the focus surface * produce new final NEFDs for total power * produce new final NEFDs for polarimetry (probably and likely in Autumn). |
Back to the NIKA2 Run 80 main page
Contents
Preliminaries (last update: 2026/03/17):
- According to DJ, a new sweep is provided before the beginning of this re-commissioning week. We will proceed as usual: (i) point/focus with the old sweep, (ii) get beam maps with the new sweep, (iii) then observe with the old sweep until the new DAFs/Kidpars are ready (it usually takes few hours).
- A correction of parameters P2 and P7 of the pointing model of NIKA2 is provided on Monday 23/3/2026 (based on the round mean of the most recent pointing corrections: ΔAz. = 4", ΔEl. = 6")
A complete report about the intervention of NIKA2+ for hardware adaptation to focus differences can be read here.
Notes for the next (run 80) re-commissioning campaign (under construction):
Main Goals
- New sweep (run 80)
- produce high-quality DAFs/RPPs and Kidpars
- determine the optimal Z focus position and study the focus surface
- produce new final NEFDs for total power
- produce new final NEFDs for polarimetry (probably and likely in Autumn).
