| '''Preliminary notes (last update: 2026/03/17):''' <<BR>> | |
| Line 7: | Line 6: |
| * According to DJ, a new sweep is provided before the beginning of this Recommissioning week. | = Preliminaries (last update: 2026/03/17): = * According to DJ, a new sweep is provided before the beginning of this Recommissioning week. We will proceed as usual: (i) point/focus with the old sweep, (ii) get beam maps with the new sweep, (iii) then observe with the old sweep until the new DAFs/Kidpars are ready (it usually takes few hours). |
| Line 10: | Line 11: |
= Notes for the next (run 80) re-commissioning campaign: = |
Back to the NIKA2 Run 80 main page
Contents
Preliminaries (last update: 2026/03/17):
- According to DJ, a new sweep is provided before the beginning of this Recommissioning week. We will proceed as usual: (i) point/focus with the old sweep, (ii) get beam maps with the new sweep, (iii) then observe with the old sweep until the new DAFs/Kidpars are ready (it usually takes few hours).
- A correction of parameters P2 and P7 of the pointing model of NIKA2 is provided on Monday 23/3/2026 (based on the round mean of the most recent pointing corrections: ΔAz. = 4", ΔEl. = 6")