| '''Preliminary notes (last update: 2026/03/17):''' <<BR>> | |
| Line 7: | Line 6: |
| * According to DJ, a new sweep is provided before the beginning of this Recommissioning week. | = Preliminaries (last update: 2026/03/17): = * According to DJ, a new sweep is provided before the beginning of this re-commissioning week. We will proceed as usual: (i) point/focus with the old sweep (run 91), (ii) get beam maps with the new sweep (run 92), (iii) then observe with the old sweep until the new DAFs/Kidpars are ready (it usually takes few hours). * '''Note''': if the new sweep is only for Ar3, we won't need to switch between new and old sweep, because Ar2 and Ar1 will be available for pointing and focus :-) |
| Line 10: | Line 13: |
* A complete report about the intervention of NIKA2+ for hardware adaptation to focus differences can be read [[https://publicwiki.iram.es/NIKA2%2BFocDiffAdaptWork|here]]. In principle, array 1 was not touched during the NIKA2+ intervention. Similar focus corrections are expected for all three arrays. = Notes for the next (run 80) re-commissioning campaign (under construction): = * For re-commissioning tests/observations, NIKA2 account t22 should be used (~/pako/202503/). * If the opportunity arises/a decision is made to continue observations of the NIKA2 pool, or even heterodyne pool programs, use the accounts nikaw-25 or poolw-25, respectively. == Main Goals == * New sweep (run 92), likely only for Ar3 (19/3/2026 update: ready; see the last record [[https://publicwiki.iram.es/NIKA2%2BFocDiffAdaptWork|here]]). * Preliminary check of the system on the sky, getting first pointing/focus corrections * Produce high-quality DAFs/RPPs and Kidpars * Determine the optimal Z focus position and study the new focus surface per array * Produce new final NEFDs, in total power and polarization (as possible) == Preparation notes == == Schedule == == Staff == |
Back to the NIKA2 Run 80 main page
Contents
Preliminaries (last update: 2026/03/17):
- According to DJ, a new sweep is provided before the beginning of this re-commissioning week. We will proceed as usual: (i) point/focus with the old sweep (run 91), (ii) get beam maps with the new sweep (run 92), (iii) then observe with the old sweep until the new DAFs/Kidpars are ready (it usually takes few hours).
Note: if the new sweep is only for Ar3, we won't need to switch between new and old sweep, because Ar2 and Ar1 will be available for pointing and focus
- A correction of parameters P2 and P7 of the pointing model of NIKA2 is provided on Monday 23/3/2026 (based on the round mean of the most recent pointing corrections: ΔAz. = 4", ΔEl. = 6")
A complete report about the intervention of NIKA2+ for hardware adaptation to focus differences can be read here. In principle, array 1 was not touched during the NIKA2+ intervention. Similar focus corrections are expected for all three arrays.
Notes for the next (run 80) re-commissioning campaign (under construction):
- For re-commissioning tests/observations, NIKA2 account t22 should be used (~/pako/202503/).
- If the opportunity arises/a decision is made to continue observations of the NIKA2 pool, or even heterodyne pool programs, use the accounts nikaw-25 or poolw-25, respectively.
Main Goals
New sweep (run 92), likely only for Ar3 (19/3/2026 update: ready; see the last record here).
- Preliminary check of the system on the sky, getting first pointing/focus corrections
- Produce high-quality DAFs/RPPs and Kidpars
- Determine the optimal Z focus position and study the new focus surface per array
- Produce new final NEFDs, in total power and polarization (as possible)
Preparation notes
Schedule