Differences between revisions 1 and 13 (spanning 12 versions)
Revision 1 as of 2026-03-17 09:04:51
Size: 439
Comment:
Revision 13 as of 2026-03-17 09:47:56
Size: 1175
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
<<TableOfContents(3)>> <<TableOfContents>>
Line 5: Line 5:
'''Preliminary notes (last update: 2026/03/17):''' <<BR>>
Line 7: Line 6:
 * According to DJ, a new sweep is provided before the beginning of this Recommissioning week. = Preliminaries (last update: 2026/03/17): =

 * According to DJ, a new sweep is provided before the beginning of this re-commissioning week. We will proceed as usual: (i) point/focus with the old sweep, (ii) get beam maps with the new sweep, (iii) then observe with the old sweep until the new DAFs/Kidpars are ready (it usually takes few hours).
Line 10: Line 11:

 * A complete report about the intervention of NIKA2+ for hardware adaptation to focus differences can be read [[https://publicwiki.iram.es/NIKA2%2BFocDiffAdaptWork|here]].

= Notes for the next (run 80) re-commissioning campaign (under construction): =

== Main Goals ==

 * New sweep (run 80)
 * produce high-quality DAFs/RPPs and Kidpars
 * determine the optimal Z focus position and study the focus surface
 * produce new final NEFDs for total power
 * produce new final NEFDs for polarimetry (probably and likely in Autumn).

Back to the NIKA2 Run 80 main page

Preliminaries (last update: 2026/03/17):

  • According to DJ, a new sweep is provided before the beginning of this re-commissioning week. We will proceed as usual: (i) point/focus with the old sweep, (ii) get beam maps with the new sweep, (iii) then observe with the old sweep until the new DAFs/Kidpars are ready (it usually takes few hours).
  • A correction of parameters P2 and P7 of the pointing model of NIKA2 is provided on Monday 23/3/2026 (based on the round mean of the most recent pointing corrections: ΔAz. = 4", ΔEl. = 6")
  • A complete report about the intervention of NIKA2+ for hardware adaptation to focus differences can be read here.

Notes for the next (run 80) re-commissioning campaign (under construction):

Main Goals

  • New sweep (run 80)
  • produce high-quality DAFs/RPPs and Kidpars
  • determine the optimal Z focus position and study the focus surface
  • produce new final NEFDs for total power
  • produce new final NEFDs for polarimetry (probably and likely in Autumn).