NIKA2 run #4 March 2016

Back to the NIKA2 run 4 page

Goals of the run

Continue tests on the instrument with same arrays since run 1 and same NIKEL boards as run 3.

(*) Status of beams characterization from previous runs:

The detailed characterization plan established for run 1 is still valid, but needs to be updated; you can still look at it to check possible missing action items: http://www.iram.fr/wiki/nika2/index.php/NIKA2_Run1_30m_CharacterizationPlan A more summarized and concise version will be written as soon as possible (SL).

Preparation of the run

Telescope Schedule week 1 Telescope Schedule weeks 2

Astronomer of Duty

Staff of the run: table of the nights spent at the observatory for the NIKA2 collaboration members participating to the run (T means Tuesday, S means Saturday, first night with NIKA2 staff is Tuesday 29 September, last night is Monday 9 November, 1 stands for night scheduled at the telescope, p stands for possible extension in case of problem with the cryostat). In italic: not at the telescope but on watch for possible remote help or intervention on the software and/or remote control.

People\Date

T1

2

3

4

S5

6

7

T8

9

10

11

S12

13

14

A.Catalano

1

1

1

1

1

1

1

A.Maury

1

1

1

1

1

1

J.F.Macias-Perez

1

1

1

1

1

1

1

1

J.Ph.Bernard

1

1

1

1

1

1

1

1

1

1

1

1

1

1

M. de Petris

1

1

1

1

1

1

A.Beelen

1

1

1

1

1

1

1

1

F.Ruppin

1

1

1

1

1

1

1

C.Romero

1

1

1

1

1

H.Aussel

1

1

1

1

1

1

Sleep at obs.

4

4

4

4

4

4

6

4

4

5

5

5

4

3

N. Billot (AOD)

1

1

1

1

1

1

1

A. Sievers (AOD)

1

1

1

1

1

1

1