NIKA2 run #4 March 2016
Goals of the run
_Continue tests on the instrument with same arrays since run 1 and same NIKEL boards as run 3._
- Check data & flags consistency & synchronization. Raw, FIT for Pipeline, IMBFIT. 
- Test synchronization of NIKA2 samples with telescope coordinates: some hints in previous data of possible systematic error (e.i. using PPS time maybe not sufficient) => to test this possibility do scans (beam maps) at various speed and and scan pattern (not only zig zag, but also only increasing azimuth, only increasing azimuth etc.; need to edit PaKo scripts !) 
- Run 3 show a pretty nice Array 1 in terms of stability, and
* Understand the beams is still a priority: previous runs show at 2mm the dichroic deformation is dominant; lab measures show an asymmetry on
- Beside will provide data to monitor kid stability, photometry, sensitivity and time line features, and get statistics on these parameters
- Skydips
- A session of KIDs working point optimization
- Continue observations of many calibrators to monitor our sensitivity and photometry
- Depending on the completion of previous items, go for more advanced characterizations, like extended features and polarization
The detailled characterization plan established for run 1 is still valid, and ongoing: http://www.iram.fr/wiki/nika2/index.php/NIKA2_Run1_30m_CharacterizationPlan A more summarized and concise version will be written as soon as possible (SL).
Preparation of the run
Telescope Schedule weeks 0 & 1 Telescope Schedule weeks 2 & 3
Staff of the run: table of the nights spent at the observatory for the NIKA2 collaboration members participating to the run (T means Tuesday, S means Saturday, first night with NIKA2 staff is Tuesday 29 September, last night is Monday 9 November, 1 stands for night scheduled at the telescope, p stands for possible extension in case of problem with the cryostat). In italic: not at the telescope but on watch for possible remote help or intervention on the software and/or remote control.
| People\Date | T12 | 13 | 14 | 15 | S16 | 17 | 18 | T19 | 20 | 21 | 22 | S23 | 24 | 25 | T26 | 27 | 28 | 29 | S30 | 31 | 01 | 02 | 
| A.Monfardini | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| O.Bourrion | 1 | 1 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| M.Calvo | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 
 | 
| A.Benoit | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| A.Catalano | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| L.Perotto | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| B.Comis | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 
 | 
| A.Ritacco | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 1 | 1 | 1 | 1 | 1 | 
 | 
| S.Leclercq | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 
 | 
 | 
 | 
 | 
 | 
 | 
| N.Ponthieu | 
 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| F.Ruppin | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| J.F.Lestrade | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| A. Bracco | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 
 | 
| J.Soler | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 1 | 1 | 1 | 1 | 1 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| F.-X.Désert | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| A.Beelen | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| J.Macias-P. | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Sleep at obs. | 3 | 4 | 3 | 3 | 3 | 3 | 3 | 4 | 4 | 5 | 5 | 5 | 5 | 5 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 
 | 
| N. Billot (AOD) | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| A. Sievers (AOD) | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 
 | 
Program
- before 12/01: Start cool down.
- 12/01 - 13/01: Installation of the new NIKEL boards. Receiver cabin available few hours per day.
- 14/01 - 19/01: Cooling down, test system. Receiver cabin available few hours per day.
- 19/01 - 26/01: Testing NIKA2 on sky; 24h/day of telescope time.
- 27/01 - 02/02: Testing NIKA2 on sky; 17h/day of telescope time..
