Differences between revisions 1 and 2
Revision 1 as of 2016-02-24 10:41:37
Size: 5544
Comment:
Revision 2 as of 2016-02-24 10:45:41
Size: 5686
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
___Continue tests on the instrument with same arrays since run 1 and same NIKEL boards as run 3.___ __Continue tests on the instrument with same arrays since run 1 and same NIKEL boards as run 3.__
Line 10: Line 10:
 * Run 3 show a pretty nice Array 1 in terms of stability, and  * Understand difference between array 1, which is pretty stable, and array 3, which is much less stable: both arrays being identical, electronic boards are possible suspect: exchange boards and do beam maps.
 * Understand the beams is still a priority: previous runs show at 2mm the dichroic deformation is dominant; lab measures show an asymmetry on
Line 12: Line 13:
* Understand the beams is still a priority: previous runs show at 2mm the dichroic deformation is dominant; lab measures show an asymmetry on
 
* Beside will provide data to monitor kid stability, photometry, sensitivity and time line features, and get statistics on these parameters
* Beside will provide data to monitor kid stability, photometry, sensitivity and time line features, and get statistics on these parameters

NIKA2 run #4 March 2016

Back to the NIKA2 run 4 page

Goals of the run

Continue tests on the instrument with same arrays since run 1 and same NIKEL boards as run 3.

  • Check data & flags consistency & synchronization. Raw, FIT for Pipeline, IMBFIT.

  • Test synchronization of NIKA2 samples with telescope coordinates: some hints in previous data of possible systematic error (e.i. using PPS time maybe not sufficient) => to test this possibility do scans (beam maps) at various speed and and scan pattern (not only zig zag, but also only increasing azimuth, only increasing azimuth etc.; need to edit PaKo scripts !)

  • Understand difference between array 1, which is pretty stable, and array 3, which is much less stable: both arrays being identical, electronic boards are possible suspect: exchange boards and do beam maps.
  • Understand the beams is still a priority: previous runs show at 2mm the dichroic deformation is dominant; lab measures show an asymmetry on

* Beside will provide data to monitor kid stability, photometry, sensitivity and time line features, and get statistics on these parameters

  • Skydips
  • A session of KIDs working point optimization
  • Continue observations of many calibrators to monitor our sensitivity and photometry
  • Depending on the completion of previous items, go for more advanced characterizations, like extended features and polarization

The detailled characterization plan established for run 1 is still valid, and ongoing: http://www.iram.fr/wiki/nika2/index.php/NIKA2_Run1_30m_CharacterizationPlan A more summarized and concise version will be written as soon as possible (SL).

Preparation of the run

Telescope Schedule weeks 0 & 1 Telescope Schedule weeks 2 & 3

Astronomer of Duty

Staff of the run: table of the nights spent at the observatory for the NIKA2 collaboration members participating to the run (T means Tuesday, S means Saturday, first night with NIKA2 staff is Tuesday 29 September, last night is Monday 9 November, 1 stands for night scheduled at the telescope, p stands for possible extension in case of problem with the cryostat). In italic: not at the telescope but on watch for possible remote help or intervention on the software and/or remote control.

People\Date

T12

13

14

15

S16

17

18

T19

20

21

22

S23

24

25

T26

27

28

29

S30

31

01

02

A.Monfardini

1

1

1

1

1

1

1

1

1

1

1

1

1

1

O.Bourrion

1

1

M.Calvo

1

1

1

1

1

1

1

A.Benoit

A.Catalano

L.Perotto

1

1

1

1

1

1

1

B.Comis

1

1

1

1

1

1

1

A.Ritacco

1

1

1

1

1

S.Leclercq

1

1

1

1

1

1

1

N.Ponthieu

1

1

1

1

1

1

1

1

F.Ruppin

1

1

1

1

1

1

1

J.F.Lestrade

1

1

1

1

1

1

1

A. Bracco

1

1

1

1

1

1

1

J.Soler

1

1

1

1

1

F.-X.Désert

A.Beelen

J.Macias-P.

Sleep at obs.

3

4

3

3

3

3

3

4

4

5

5

5

5

5

4

4

4

4

4

4

4

N. Billot (AOD)

1

1

1

1

1

1

1

A. Sievers (AOD)

1

1

1

1

1

1

1

Program

  • before 12/01: Start cool down.
  • 12/01 - 13/01: Installation of the new NIKEL boards. Receiver cabin available few hours per day.
  • 14/01 - 19/01: Cooling down, test system. Receiver cabin available few hours per day.
  • 19/01 - 26/01: Testing NIKA2 on sky; 24h/day of telescope time.
  • 27/01 - 02/02: Testing NIKA2 on sky; 17h/day of telescope time..

GoalsPrepStaffNika2Run4 (last edited 2016-03-03 14:46:30 by NikaBolometer)