NIKA2 run #1 October 2015
Goals of the run
- Installation, first cool down and fisrt light of NIKA2 at the 30m telescope
- Initial tests procedures: instrument response, data acquisition, alignment, pointing, focus, geometry (identification of resonances with pixels locations on the arrays),
- Many beam maps to monitor kid stability, photometry, to get statistics on these parameters
- Many skydips, especially at high opacity
- A session of KIDs working point optimization
- A pointing session
- More maps for statistics of data quality control
- Observations of many calibrators to monitor our photometry
For details go to the dedicated private wiki.
EVERYTHING BELOW IS A COPY FROM AN OLD TEST RUN OF NIKA, USED AS TEMPLATE TO BE UPDATED WITH NIKA2 RUN1 INFO
Preparation of the run
January presence at Pico (Dash (-) is for travel with night in the Granada office room on 1stDayAtPico-1, and go down from Pico and travel on FinalDayAtPico+1, X is night at Pico)
Name |
Mon 13 |
Tue 14 |
Wed 15 |
Thu 16 |
Fri 17 |
Sat 18 |
Sun 19 |
Mon 20 |
Tue 21 |
Wed 22 |
Thu 23 |
Fri 24 |
Sat 25 |
Sun 26 |
Mon 27 |
Tue 28 |
Nicolas Ponthieu |
|
|
|
- |
X |
X |
X |
X |
X |
X |
X |
- |
|
|
|
|
Alain B. |
|
|
|
|
- |
X |
X |
X |
X |
X |
- |
|
|
|
|
|
Alessandro M. |
|
|
|
|
- |
X |
X |
X |
X |
- |
- |
|
|
|
|
|
Andrea C. |
- |
X |
X |
X |
X |
X |
X |
X |
X |
X |
- |
|
|
|
|
|
Martino C. |
|
|
|
|
|
|
|
- |
X |
X |
X |
X |
X |
X |
X |
- |
Samuel L. |
|
|
|
|
|
|
|
- |
X |
X |
X |
X |
X |
X |
X |
- |
Alessia R. |
|
|
|
|
|
|
|
- |
X |
X |
X |
X |
X |
X |
X |
- |
Reveret V. |
|
|
|
|
|
|
|
|
|
|
- |
X |
X |
X |
X |
- |
Number of people |
0 |
1 |
1 |
1 |
2 |
4 |
4 |
4 |
7 |
6 |
4 |
4 |
4 |
4 |
4 |
0 |
Min room requirement* |
0 |
1 |
1 |
1 |
1 |
2 |
2 |
2 |
4 |
3 |
3 |
3 |
3 |
3 |
3 |
0 |
* Min room requirement gives the minimal number of room required at the telescope, implying several persons can share room in case the occupancy at the telescope is such that single rooms can't be provided to all (according to Dec 5 2013's status of the telescope room schedule everybody can have a single room; except maybe the 21 and 22 a double room might be necessary).
January presence at Grenoble, for offline data analysis
Name |
Fri 17 |
Sat 18 |
Sun 19 |
Mon 20 |
Tue 21 |
Wed 22 |
Thu 23 |
Fri 24 |
Sat 25 |
Sun 26 |
Mon 27 |
RĂ©mi A. |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Juan M-P |
X |
X |
X |
|
|
|
X |
X |
X |
X |
X |
Xavier D. |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Nicolas P. |
|
|
|
|
|
|
|
|
X |
X |
X |
Frederic M |
|
X |
X |
X (matin) |
X (apres midi) |
X |
X |
X |
|
|
X (matin) |
Laurence P |
|
|
|
|
X |
X |
|
X |
X? |
X? |
|
Guilaine L. |
|
|
|
|
X |
|
|
|
|
|
X |
Alexandre B. |
|
|
|
|
X |
|
|
|
|
|
X |
Andrea C. |
|
|
|
|
|
|
|
X |
X |
X |
X |
Barbara C. |
X |
X |
X |
X |
X |
X |
|
X (matin) |
|
|
|
Observations schedule (from telescope schedule)
- 18-20h (Local time) on 18, 19 and 20 January 2014
- 17h30-7h (Local time) on the night 21-22 January 2014
- 13-01h on the night 22-23 January 2014
- 17-01h on 23, 24, 25, 26, et 27 January 2014
Program
- 14/1 Day-6 (Tu 14/1): Start cooling down (during mainteinance). Remotely with support in the cabin.
- 17/1 Days -3 (Fr) Arrival Alain, Andrea, Alessandro, Nicolas.
- Days -2 (Sa), -1 (Su), 0 (Mo): KID tuning and technical tests.
- 21/1 Day1. Arrival of Martino, Samuel, Alessia, Xavier. Leaving: Alain ??. Intens; OTF_geometry Uranus. Pointing model.
- Day2 (We): Polar; debug
- 23/1 Day3. Leaving Alessandro, Nicolas. (Th): Intens; Validate all sequences
- Day4 (Fr): Polar; Planets, quasars
- Day5 (Sa): Intens; Validate integration time
- Day6 (Su): Polar; Crab Orion
- Day7 (Mo): Backup
Travel plans
TBW