Differences between revisions 4 and 5
Revision 4 as of 2013-11-12 08:32:47
Size: 1455
Comment:
Revision 5 as of 2013-11-12 08:33:07
Size: 1462
Comment:
Deletions are marked like this. Additions are marked like this.
Line 28: Line 28:
 Day1: Intens; OTF_geometry Uranus. Pointing model.
 Day2: Polar; debug
 Day3: Intens; Validate all sequences
 Day4: Polar; Planets, quasars
 Day5: Intens; Validate integration time
 Day6: Polar; Crab Orion
 Day7: Backup
 -Day1: Intens; OTF_geometry Uranus. Pointing model.
 -Day2: Polar; debug
 -Day3: Intens; Validate all sequences
 -Day4: Polar; Planets, quasars
 -Day5: Intens; Validate integration time
 -Day6: Polar; Crab Orion
 -Day7: Backup

NIKA run #7 January 2014

Back to the NIKA run 7

Goals of the run

Test the final NIKA configuration on the sky with Winter conditions. Validate the pipeline. Test the polarization setup on the sky. 56h total. About 8h/day. Leave the cryostat cold and ready for the scientific run (#8) in February 2014.

  1. Characterization of the final NIKA prototype configuration (5h)
  2. Perform a new pointing model starting from the old NIKA Run6 one. (5h)
  3. Validate all sequences (pointing, focus, skydip, zigzag otf map, Lissajou map). (5h)
  4. Check the sensitivity and time estimator.(5h)
  5. Perform some science demonstration observations on a best effort basis: Check the noise integration for 6 hours oriented towards deep field measurements, Establish standard faint source photometry (6h mostly high-z faint sources (10-40 mJy).
  6. Perform on-sky measurements of polarization at 1 and 2 mm. Use planets, quasars, the Crab Nebula, CasA, and Orion. (24h).

Preparation of the run

TBW (Nov 2013)

Tentative schedule

  • 15-23h (Local time) on 21 and 22 January 2014 17-01h on 23, 24, 25, 26, et 27 January 2014

Program:

  • -Day1: Intens; OTF_geometry Uranus. Pointing model. -Day2: Polar; debug -Day3: Intens; Validate all sequences -Day4: Polar; Planets, quasars -Day5: Intens; Validate integration time -Day6: Polar; Crab Orion -Day7: Backup

Travel plans

TBW

GoalsPrepStaffN7 (last edited 2014-01-17 15:52:14 by NikaBolometer)