NIKA run #7 January 2014
Goals of the run
Test the final NIKA configuration on the sky with Winter conditions. Validate the pipeline. Test the polarization setup on the sky. 56h total. About 8h/day. Leave the cryostat cold and ready for the scientific run (#8) in February 2014.
- Characterization of the final NIKA prototype configuration (5h)
- Perform a new pointing model starting from the old NIKA Run6 one. (5h)
- Validate all sequences (pointing, focus, skydip, zigzag otf map, Lissajou map). (5h)
- Check the sensitivity and time estimator.(5h)
- Perform some science demonstration observations on a best effort basis: Check the noise integration for 6 hours oriented towards deep field measurements, Establish standard faint source photometry (6h mostly high-z faint sources (10-40 mJy).
- Perform on-sky measurements of polarization at 1 and 2 mm. Use planets, quasars, the Crab Nebula, CasA, and Orion. (24h).
Preparation of the run
January presence at Pico (travel is 1stDay-1, FinalDay+1)
Name |
Fri 17 |
Sat 18 |
Sun 19 |
Mon 20 |
Tue 21 |
Wed 22 |
Thu 23 |
Fri 24 |
Sat 25 |
Sun 26 |
Mon 27 |
Tue 28 |
Nicolas P. |
X |
X |
X |
X |
X |
X |
X |
|
|
|
|
|
Alain B. |
|
X |
X |
X |
X |
X |
|
|
|
|
|
|
Alessandro M. |
|
X |
X |
X |
X |
X |
|
|
|
|
|
|
Andrea C. |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Martino C. |
|
|
|
|
X |
X |
X |
X |
X |
X |
X |
X |
Samuel L. |
|
|
|
|
X |
X |
X |
X |
X |
X |
X |
X |
Alessia R. |
|
|
|
|
X |
X |
X |
X |
X |
X |
X |
X |
Reveret V. |
|
|
|
|
|
|
X |
X |
X |
X |
X |
X |
Room requirement* |
2 |
4 |
4 |
4 |
7 |
7 |
6 |
5 |
5 |
5 |
5 |
5 |
* Room requirement gives the minimal number of room required at the telescope, implying several persons will have to share room in case the occupancy at the telescope is such that single rooms can't be provided to all.
January presence at Grenoble, for offline data analysis
Name |
Fri 17 |
Sat 18 |
Sun 19 |
Mon 20 |
Tue 21 |
Wed 22 |
Thu 23 |
Fri 24 |
Sat 25 |
Sun 26 |
Mon 27 |
Tue 28 |
Rémi A. |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Juan M-P |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Xavier D. |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Nicolas P. |
|
|
|
|
|
|
|
|
X |
X |
X |
X |
Tentative schedule
- 15-23h (Local time) on 21 and 22 January 2014
- 17-01h on 23, 24, 25, 26, et 27 January 2014
Real schedule
Program
- 14/1 Day-6 (Tu 14/1): Start cooling down (during mainteinance). Remotely with support in the cabin.
- 17/1 Days -3 (Fr) Arrival Alain, Andrea, Alessandro, Nicolas.
- Days -2 (Sa), -1 (Su), 0 (Mo): KID tuning and technical tests.
- 21/1 Day1. Arrival of Martino, Samuel, Alessia, Xavier. Leaving: Alain ??. Intens; OTF_geometry Uranus. Pointing model.
- Day2 (We): Polar; debug
- 23/1 Day3. Leaving Alessandro, Nicolas. (Th): Intens; Validate all sequences
- Day4 (Fr): Polar; Planets, quasars
- Day5 (Sa): Intens; Validate integration time
- Day6 (Su): Polar; Crab Orion
- Day7 (Mo): Backup
Travel plans
TBW