Differences between revisions 15 and 16
Revision 15 as of 2013-11-28 16:13:16
Size: 3675
Comment:
Revision 16 as of 2013-11-28 16:14:51
Size: 3722
Comment:
Deletions are marked like this. Additions are marked like this.
Line 18: Line 18:
In January January presence at Pico (travel is 1stDay-1, FinalDay+1)

NIKA run #7 January 2014

Back to the NIKA run 7

Goals of the run

Test the final NIKA configuration on the sky with Winter conditions. Validate the pipeline. Test the polarization setup on the sky. 56h total. About 8h/day. Leave the cryostat cold and ready for the scientific run (#8) in February 2014.

  1. Characterization of the final NIKA prototype configuration (5h)
  2. Perform a new pointing model starting from the old NIKA Run6 one. (5h)
  3. Validate all sequences (pointing, focus, skydip, zigzag otf map, Lissajou map). (5h)
  4. Check the sensitivity and time estimator.(5h)
  5. Perform some science demonstration observations on a best effort basis: Check the noise integration for 6 hours oriented towards deep field measurements, Establish standard faint source photometry (6h mostly high-z faint sources (10-40 mJy).
  6. Perform on-sky measurements of polarization at 1 and 2 mm. Use planets, quasars, the Crab Nebula, CasA, and Orion. (24h).

Preparation of the run

January presence at Pico (travel is 1stDay-1, FinalDay+1)

Name

Thu 17

Fri 18

Sat 19

Sun 20

Mon 21

Tue 22

Wed 23

Thu 24

Fri 25

Sat 26

Sun 27

Mon 28

Nicolas P.

X

X

X

X

X

X

X

Alain B.

X

X

X

X

X

X

Alessandro M.

X

X

X

X

X

X

Andrea C.

X

X

X

X

X

X

Martino C.

X

X

X

X

X

X

X

X

F. Xavier D.

X

X

X

X

X

X

X

X

Samuel L.

X

X

X

X

X

X

X

X

Alessia R.

X

X

X

X

X

X

X

X

Tentative schedule

  • 15-23h (Local time) on 21 and 22 January 2014
  • 17-01h on 23, 24, 25, 26, et 27 January 2014

Real schedule

Real schedule

Program

  • 14/1 Day-6 (Tu 14/1): Start cooling down (during mainteinance). Remotely with support in the cabin.
  • 17/1 Days -3 (Fr) Arrival Alain, Andrea, Alessandro, Nicolas.
  • Days -2 (Sa), -1 (Su), 0 (Mo): KID tuning and technical tests.
  • 21/1 Day1. Arrival of Martino, Samuel, Alessia, Xavier. Leaving: Alain ??. Intens; OTF_geometry Uranus. Pointing model.
  • Day2 (We): Polar; debug
  • 23/1 Day3. Leaving Alessandro, Nicolas. (Th): Intens; Validate all sequences
  • Day4 (Fr): Polar; Planets, quasars
  • Day5 (Sa): Intens; Validate integration time
  • Day6 (Su): Polar; Crab Orion
  • Day7 (Mo): Backup

Travel plans

TBW

GoalsPrepStaffN7 (last edited 2014-01-17 15:52:14 by NikaBolometer)