Size: 1534
Comment:
|
Size: 1584
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 24: | Line 24: |
|| 10.06. Monday || Alain, Xavier, Juan, Andrea?, Samuel?, NicolasB at the 30m|| || 11.06. Tuesday || Alain, Xavier, Juan, Andrea?, Samuel?, NicolasB || || 12.06. Wednesday|| Xavier, Juan, Andrea?, Samuel?, NicolasB || |
|| 10.06. Monday || Alain, Martino, Xavier, Juan, Rémi?, Andrea?, Samuel?, NicolasB at the 30m|| || 11.06. Tuesday || Alain, Martino, Xavier, Juan, Rémi?, Andrea?, Samuel?, NicolasB || || 12.06. Wednesday|| Martino, Xavier, Juan, Rémi, Andrea?, Samuel?, NicolasB || |
NIKA run #6 (11-18 June 2013)
Goals of the run
Install and test the new 2mm array and the 1mm cold amplifier (see the preparation run)
Commission the NIKA prototype and make a full characterization of the system on sky (not an astronomical oriented run).
- Characterization of the final NIKA prototype configuration
- Perform a new pointing model starting from the old NIKA Run5 one.
- Commission all sequences (pointing, focus, skydip, zigzag otf map, Lissajou map).
- Get the sensitivity and time estimator right.
- Perform some science demonstration observations on a best effort basis.
Preparation of the run
Summary schedule of the run: Preliminary
Dates |
Main Event |
10.06. Monday |
Alain, Martino, Xavier, Juan, Rémi?, Andrea?, Samuel?, NicolasB at the 30m |
11.06. Tuesday |
Alain, Martino, Xavier, Juan, Rémi?, Andrea?, Samuel?, NicolasB |
12.06. Wednesday |
Martino, Xavier, Juan, Rémi, Andrea?, Samuel?, NicolasB |
13.06. Thursday |
Alessandro, Martino, Xavier, Juan, Rémi, Andrea?, Samuel?, NicolasB |
18.06. Tuesday 10h |
End of the run |
Nicolas Ponthieu (+Frédéric Mayet and Laurence Perrotto) work remotely on offline data reduction
Staff of the run
Phone contact:
- Alain: +33 6 02 08 50 48
- Martino: +33 6 01 49 90 11
- Alessandro: +33 6 11 57 01 61
- Xavier: +33 6 27 36 07 97