Differences between revisions 2 and 3
Revision 2 as of 2013-05-02 08:37:58
Size: 1632
Comment:
Revision 3 as of 2013-05-02 09:30:14
Size: 1534
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
Install and test the new 2mm array and the 1mm cold amplifier Then Commission the NIKA prototype.
Full characterization of the system on sky, not an astronomical oriented run.
Install and test the new 2mm array and the 1mm cold amplifier (see [[PrepRun6|the preparation run]])

Commission the NIKA prototype and make a full characterization of the system on sky (not an astronomical oriented run).
Line 11: Line 12:
 2. Commission all sequences (pointing, focus, skydip, zigzag otf map, Lissajou map).
 3. Test implementation of NIKA in NCS, and perform a complete calibration sequence including pointing model.
 4. Test quick pre-scan KID auto-tunings procedure.
 6. Test on site the new NIKEL electronics (that has been qualified in lab).
 7. Have a training session on how to start the NIKA cryogenics.
 8. Perform some science demonstration observations.
 2. Perform a new pointing model starting from the old NIKA Run5 one.
 3. Commission all sequences (pointing, focus, skydip, zigzag otf map, Lissajou map).
 4. Get the sensitivity and time estimator right.
 5. Perform some science demonstration observations on a best effort basis.
Line 22: Line 21:
Summary schedule of the run: Summary schedule of the run: Preliminary
Line 24: Line 23:
|| '''Dates''' || '''Main Event'''||
|| 09.11. Friday || Alessandro, Martino, Samuel at the 30m; start cooldown||
|| 13.11. Tuesday || Alessandro, Martino, Samuel, Nicolas P, Juan MP at the 30m; Start 7h/day telescope time period for testing, characterization, calibration ||
|| 19.11. Monday || Teams overlapp, arrival Xavier, Andrea, A. Beleem||
|| 20.11. Tuesday || Departure 1st week team, start 16h/day telescope time observations||
|| 27.11. Tuesday || End of the run ||
|| '''Dates''' || '''Main Event'''||
|| 10.06. Monday || Alain, Xavier, Juan, Andrea?, Samuel?, NicolasB at the 30m||
|| 11.06. Tuesday || Alain, Xavier, Juan, Andrea?, Samuel?, NicolasB ||
|| 12.06. Wednesday|| Xavier, Juan, Andrea?, Samuel?, NicolasB ||
|| 13.06. Thursday || Alessandro, Martino, Xavier, Juan, Rémi, Andrea?, Samuel?, NicolasB||
|| 18.06. Tuesday 10h || End of the run ||

Nicolas Ponthieu (+Frédéric Mayet and Laurence Perrotto) work remotely on offline data reduction
Line 35: Line 36:
 * Alain: +33 6 02 08 50 48
 * Martino: +33 6 01 49 90 11
 * Alain:      +33 6 02 08 50 48
 * Martino:    +33 6 01 49 90 11
Line 38: Line 39:
 * Philippe: +33 6 30 70 73 63
* Xavier: +33 6 27 36 07 97
 * Xavier:     +33 6 27 36 07 97

NIKA run #6 (11-18 June 2013)

Back to the NIKA run 6

Goals of the run

Install and test the new 2mm array and the 1mm cold amplifier (see the preparation run)

Commission the NIKA prototype and make a full characterization of the system on sky (not an astronomical oriented run).

  1. Characterization of the final NIKA prototype configuration
  2. Perform a new pointing model starting from the old NIKA Run5 one.
  3. Commission all sequences (pointing, focus, skydip, zigzag otf map, Lissajou map).
  4. Get the sensitivity and time estimator right.
  5. Perform some science demonstration observations on a best effort basis.

Preparation of the run

Telescope Schedule T21-13

Summary schedule of the run: Preliminary

Dates

Main Event

10.06. Monday

Alain, Xavier, Juan, Andrea?, Samuel?, NicolasB at the 30m

11.06. Tuesday

Alain, Xavier, Juan, Andrea?, Samuel?, NicolasB

12.06. Wednesday

Xavier, Juan, Andrea?, Samuel?, NicolasB

13.06. Thursday

Alessandro, Martino, Xavier, Juan, Rémi, Andrea?, Samuel?, NicolasB

18.06. Tuesday 10h

End of the run

Nicolas Ponthieu (+Frédéric Mayet and Laurence Perrotto) work remotely on offline data reduction

Staff of the run

Phone contact:

  • Alain: +33 6 02 08 50 48
  • Martino: +33 6 01 49 90 11
  • Alessandro: +33 6 11 57 01 61
  • Xavier: +33 6 27 36 07 97