= NIKA run #6 (13 - 27 Nov 2012) = = NIKA run #6 (11-18 June 2013) =
Line 7: Line 7:
Install and test the new 2mm array and the 1mm cold amplifier Then Commission the NIKA prototype.
Full ch
aracterization of the system on sky, not an astronomical oriented run.
Install and test the new 2mm array and the 1mm cold amplifier (see [[PrepRun6|the preparation run]])
Line 10: Line 9:
 1. Continue characterization / pre-comissioning of the NIKA prototype at its final position, started in June (run 4).
 2. Investigate and possibily suppress the possible remaining systematics (e.g. "plateau").
 3. Test implementation of NIKA in NCS, and perform a complete calibration sequence including pointing model.
 4. Test quick pre-scan KID auto-tunings procedure.
 6. Test on site the new NIKEL electronics (that has been qualified in lab).
 7. Have a training session on how to start the NIKA cryogenics.
 8. Perform some science demonstration observations.
Commission the NIKA prototype and make a full characterization of the system on sky (not an astronomical oriented run).

 1. Characterization of the final NIKA prototype configuration
 2. Perform a new pointing model starting from the old NIKA Run5 one.
 3. Commission all sequences (pointing, focus, skydip, zigzag otf map, Lissajou map).
 4. Get the sensitivity and time estimator right.
 5. Perform some science demonstration observations on a best effort basis.
Line 20: Line 19:
[[http://www.iram.fr/IRAMFR/PV/sche/13/s23v1.html|Telescope Schedule]] [[http://www.iram.fr/IRAMFR/PV/sche/13/s23v1.html|Telescope Schedule T21-13]]
Line 22: Line 21:
Summary schedule of the run: Summary schedule of the run: Preliminary
Line 24: Line 23:
|| '''Dates''' || '''Main Event'''||
|| 09.11. Friday || Alessandro, Martino, Samuel at the 30m; start cooldown||
|| 13.11. Tuesday || Alessandro, Martino, Samuel, Nicolas P, Juan MP at the 30m; Start 7h/day telescope time period for testing, characterization, calibration ||
|| 19.11. Monday || Teams overlapp, arrival Xavier, Andrea, A. Beleem||
|| 20.11. Tuesday || Departure 1st week team, start 16h/day telescope time observations||
|| 27.11. Tuesday || End of the run ||
|| '''Dates''' || '''Main Event'''||
|| 10.06. Monday || Alain, Martino at the 30m||
|| 11.06. Tuesday || Alain, Martino, Xavier, Rémi, Andrea||
|| 12.06. Wednesday|| Martino, Xavier, Rémi, Andrea||
|| 13.06. Thursday || Alessandro, Martino, Xavier, Juan, Rémi||
|| 18.06. Tuesday 10h || End of the run ||

Nicolas Ponthieu (+Frédéric Mayet and Laurence Perrotto) work remotely on offline data reduction
Nicolas Billot and Samuel Leclercq will be present during the run and fully collaborate.
Line 33: Line 36:
{{attachment:staff_schedule_NIKA_run5.PNG|NIKA run 5 staff schedule}}

htm version of the schedule: [[attachment:NIKA-run5_staff_v8.htm|Planning table of the run 5 NIKA staff]]
Line 38: Line 38:
 * Alain: +33 6 02 08 50 48
 * Martino: +33 6 01 49 90 11
 * Alain:      +33 6 02 08 50 48
 * Martino:    +33 6 01 49 90 11
Line 41: Line 41:
 * Philippe: +33 6 30 70 73 63
* Xavier: +33 6 27 36 07 97
 * Xavier:     +33 6 27 36 07 97

NIKA run #6 (11-18 June 2013)

Back to the NIKA run 6

Goals of the run

Install and test the new 2mm array and the 1mm cold amplifier (see the preparation run)

Commission the NIKA prototype and make a full characterization of the system on sky (not an astronomical oriented run).

  1. Characterization of the final NIKA prototype configuration
  2. Perform a new pointing model starting from the old NIKA Run5 one.
  3. Commission all sequences (pointing, focus, skydip, zigzag otf map, Lissajou map).
  4. Get the sensitivity and time estimator right.
  5. Perform some science demonstration observations on a best effort basis.

Preparation of the run

Telescope Schedule T21-13

Summary schedule of the run: Preliminary

Dates

Main Event

10.06. Monday

Alain, Martino at the 30m

11.06. Tuesday

Alain, Martino, Xavier, Rémi, Andrea

12.06. Wednesday

Martino, Xavier, Rémi, Andrea

13.06. Thursday

Alessandro, Martino, Xavier, Juan, Rémi

18.06. Tuesday 10h

End of the run

Nicolas Ponthieu (+Frédéric Mayet and Laurence Perrotto) work remotely on offline data reduction Nicolas Billot and Samuel Leclercq will be present during the run and fully collaborate.

Staff of the run

Phone contact:

  • Alain: +33 6 02 08 50 48
  • Martino: +33 6 01 49 90 11
  • Alessandro: +33 6 11 57 01 61
  • Xavier: +33 6 27 36 07 97