Differences between revisions 45 and 46
Revision 45 as of 2009-02-04 12:17:48
Size: 2924
Editor: visitor3
Comment:
Revision 46 as of 2009-02-04 12:18:47
Size: 2927
Editor: visitor3
Comment:
Deletions are marked like this. Additions are marked like this.
Line 18: Line 18:
|| || || || Software || || Albrecht || Walter, Hans, Helmut || || || || || Software || || Albrecht || Walter, Hans, Helmut || ||

[https://gra-lx1.iram.es/mainWiki/EmirProject EMIR] Installation and Commissioning at the IRAM 30m telescope

#

Dates

Main Task

Details

People at the 30m

Standby in Granada

Lead

Staff

Staff

11

10.3.-17.3.

#1: ABCD Dismounting

Santiago

Dave, Gregorio, Pako

Transport

Truck

Jean-Yves

Helicopter

Javier

12

17.3.-24.3.

#2: Installation

Santiago/Bernard?

Jean-Yves?, Dave, Anne-Laure?

IF

Salvador, Gabriel

Software

Sebastien, Walter

Albrecht, Hans, Helmut

13

24.3.-31.3.

#3: First Light & Hardware Testing

Bernard?/Santiago

Anne-Laure?, Dave, Jean-Yves?

IF

Salvador, Gabriel

Software

Sebastien, Walter

Albrecht, Hans, Helmut

|| 14 || 31.3.-7.4. || #4: [https://gra-lx1.iram.es/mainWiki/EmirCommissioningPlan Commissioning] (Week #1) || || Clemens || Carsten ||

Software

Albrecht

Walter, Hans, Helmut

15

7.4.-14.4.

16

14.4.-21.4.

#5: [https://gra-lx1.iram.es/mainWiki/EmirCommissioningPlan Commissioning] (Week #2)

Carsten

Clemens

Software

Hans

Walter, Albrecht, Helmut

17

21.4.-28.4.

TBA

cf. also with

The maximum number of people of the EMIR installation team at the 30m, will be ~6 during EMIR weeks #1-3 and ~8 during weeks #4-5. During EMIR weeks #1-3, MAMBO pooled observations are scheduled during night time, with two observers, plus AoD. Juan, two operators, and two cooks will be at the site, with 14 bedrooms.

EmirPlanning (last edited 2009-11-17 08:30:21 by lt-ck)