Differences between revisions 132 and 133
Revision 132 as of 2009-04-14 09:52:18
Size: 3044
Editor: visitor16
Comment:
Revision 133 as of 2009-04-16 08:26:29
Size: 3052
Editor: localhost
Comment: converted to 1.6 markup
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * the EMIR homepage for IRAM staff is [https://gra-lx1.iram.es/mainWiki/EmirProject here]  * the EMIR homepage for IRAM staff is [[https://gra-lx1.iram.es/mainWiki/EmirProject|here]]
Line 33: Line 33:
 * [http://www.iram.es/IRAMES/mainWiki/AstronomerOnDutySchedule AoD Schedule],
 * [http://www.iram.es/IRAMES/groups/operator/opesched.htm Operator Schedule], and
 * [http://www.iram.es/IRAMES/mainWiki/PoolW0809 schedule of MAMBO pooled observations]
 * [[http://www.iram.es/IRAMES/mainWiki/AstronomerOnDutySchedule|AoD Schedule]],
 * [[http://www.iram.es/IRAMES/groups/operator/opesched.htm|Operator Schedule]], and
 * [[http://www.iram.es/IRAMES/mainWiki/PoolW0809|schedule of MAMBO pooled observations]]

Timeline of Installation and Commissioning at the IRAM 30m telescope

  • the EMIR homepage for IRAM staff is here

#

Dates

Main Task

Details

People at the 30m

Standby in Granada

Lead

Staff

Staff

11

10.3.-17.3.

#1: ABCD Dismounting

Santiago

Transport

Truck/JYC:12.-15.3.

Helicopter/16.3.

Javier

12

17.3.-24.3.

#2: Installation

Santiago

Jean-Yves (16.-), Bruno (16.-), Dave

IF

Salvador, Gabriel

Software

Sebastien (16.-), Walter

Albrecht, Hans, Helmut

13

24.3.-31.3.

#3: First Light & Hardware Testing

Santiago

Jean-Yves (-26.), Anne-Laure(23.-26.), Dave, Bernard(23.-26.3.), Juan(23.,24.,27.3.-2.4.)

IF

Salvador, Gabriel

Software / Astronomy

Sebastien(-26.), Walter, Albrecht, Clemens(27.3.-)

Hans, Helmut

Operator Training

Manolo

14

31.3.-7.4.

#4: Commissioning

Carsten

Dirk Muders, Sascha Trippe, Juan(27.3.-Thu), Denise(Fri-Mon)

Software / Astronomy

Hans, Clemens(-Fri), Helmut(Tue-Fri)

Walter, Albrecht, Gabriel

Operator Training

Manolo

15

7.4.-14.4.

24 hours MAMBO2 pooled observations & Full Moon with EMIR

Breezy Ocana Flaquer(Mon-Tue)

16

14.4.-21.4.

#5: Commissioning

Carsten(Di-Mo)

Clemens(Di-Mo), Albert(Di-Mo), Melanie, Karl(Thu-Sun), Rebeca(Fri-Mon)

Software / Astronomy

Helmut(Tue-Fri)

Walter, Albrecht, Hans, Gabriel

17

21.4.-28.4.

#6: Commissioning & MAMBO Pool Observations

Hans(EMIR), Denise(MAMBO), Albrecht(Mo-Di?)

Helmut, Gabriel

cf. also with

The maximum number of people of the EMIR installation team at the 30m, will be ~6 during EMIR weeks #1-3 and ~8 during weeks #4-5. During EMIR weeks #1-3, MAMBO pooled observations are scheduled during night time, with two observers, plus AoD. Juan, two operators, and two cooks will be at the site, with 14 bedrooms.

Planets & Moon during Commissioning:

  • Night time: Saturn (to 60deg elev)
  • Day time: Mars (4.3" diameter, to ~45deg elevation), Uranus (to 45deg Elevation), Venus, Jupiter
  • Full moon: 9.4.

EmirPlanning (last edited 2009-11-17 08:30:21 by lt-ck)