The observed bump at ~0.3 Hz in array 3 is not evident now and the noise spectra have improved. Box C (array 2) KIDs (particularly KC037 and 025) still being a bit noisy. Screenshots from the DAQ are shown below. | The observed bump at ~0.3 Hz in array 3 is not evident now and the noise spectra have improved. Box C (array 2) KIDs (particularly KC037 and 025) still being noisy. Screenshots from the DAQ are shown below. |
Back to the NIKA2 Upgrade 2025 main page
Daily Reports
Contents
March 4th, Tuesday
Samuel, Alessandro, Martino and Gregory arrived at the telescope with many others from the IRAM Granada staff.
- First we take the decision that it is useless to check the laser alignment since it was done by Dave a few months ago and nothing was touched since then. We'll use Dave's measurement as reference.
- Today we dismounted the cryostat, with the help of Dave, removing the nose, moving the cryostat to install the rails allowing to slide all the screens to the wall, where was the nose, and access the 100mK structure where the clod optics stands (100mK lenses, dichroic, polariser, arrays). Pictures of all the steps steps are posted below.
At the end of the morning we reached the 4K screen.
On the afternoon we slid away the remaining screens, dismounted the dichroic (#2), the polariser, the smooth array side lenses of the 1mm channels, and the arrays.
- A bit of machining in the mechanical workshop was necessary to enlarge rings allowing to install the AR structured lenses. We installed these lenses and the new 1mm arrays. In parallel we changed the IR filters on the 300K screen, the 100K screen, and the 50K screen, that's the only ones we change given the type of filters provided by Cardiff (C7.5, C15, but no C30). The 3 new double faced filters we installed are all C15 types. We prepared the installation of the dichroic #1 new mount, with some machining also necessary to install the adaptation pieces on the 100 mK structure. We finished these step just before diner. We are a bit ahead of scheduled (originally we thought doing only the dismounting parts today).
- Tomorrow we install the dichroic with the new mount, then close everything back, which will take some time because of the super insulation to change at least on one screen. If everything goes well we might start pumping by the end of the day.
1) Opening NIKA2
2) Dismounting dichroic, arrays, lenses, filters to be changed, and installing the new ones
March 5th, Wednesday
- The dichroic 1 must be mounted with a 0.5 N.m torque on the screws that allow holding in sandwich the dichroic membrane and its rings between the copper parts of its mount. Yesterday we found out we were missing the dynamometric wrench allowing to get this relatively low torque. Carlos called Granada to find the one he had on the lab down there, and this morning Antonio brought it up to the telescope. In the meantime we prepared the mount. A bit of additional machining was necessary in order to install the dichroic already mounted on NIKA2 as it is impossible to install the mount first and fix the dichroic afterward because of lack of space for the wrench. Once the dichroic installed we started closing the cryostat just before lunch.
- After lunch we continued the closing process, screen after screen, checking on the way that the cold mirrors block was exactly at the same height as the one measured during the dismounting process. Around 16:30 we closed the last parts of the 300K assembly, and started pumping. While pumping, look with Carlos and Victor how to add removable wheels to the PIMP mount to ease its displacement ; Victor built the wheels system. Leak check on NIKA2 around 18:30. No leaks found. We then put back the cryostat on its original working place.
- Pumping for a few hours. We might start the cooling already tonight, otherwise tomorrow morning.
3) Continuation of the installation of the new elements (dichroic)
4) Closing NIKA2, start pumping and leak check
March 6th, Thursday
- NIKA2 cryostat under vacuum. Cooling down started before 9:00.
- Laser alignment checked, removing M3 and using the elevation bearing laser. The laser spot is on the crosses of M4, M5, M6, within 1mm uncertainty, about 1mm above the centre of the cryostat window, exactly like Dave's measurement a few month ago.
Note: if during commissioning we find out that the focal surface is asymmetric, with worse beams concentrated on a local outer zone of the Arrays, we might play on the cryostat reference level value to improve the position of the arrays on the focal surface and get something more symmetrical.
- We have finished everything before lunch, ahead of schedule. There was no major issue during the upgrade process, so we didn't have to use the contingency time we had foreseen in case of problem. We decide to go back down to Granada, and get back homme 1 day earlier than planned.
5) Check laser alignment
Bye bye NIKA2. Next episode is checking detectors are alive and resonances can be found, then do the initial sweep. This will happen at middle of next week. And if everything is fine, on the following week we start the commissioning, see Nika2Run72 !
March 7th-10th, Friday-Monday
NIKA2 is cooling down.
March 11th, Tuesday
NIKA2 has reached the 1K zone, start condensation of the 3He-4He mixture.
March 12th, Wednesday
Cryostat okay, finale: 1mm H amplifier switched on at 07:45 (DJ). T_MC=0.169K, T_Still=1.23K, T_4K=8.5. So, ready for the sweep.
New sweep done (08:30-10:00), first approach: AM, DJ, AB. Lines transmission okay. Bad KIDs (a1, a2, a3): 4/953, 12/578, 12/1000.
Array 3 time lines/noise traces show some glitches/a correlated noise feature at ~0.3 Hz (see screenshots below): PTs adjustment? Arrays 1 and 2 look okay.
Similar screenshots after the sweep in Oct. 2022 can be seen at the bottom of this site.
A new attempt for refining resonances tables will be carried out tomorrow afternoon or Friday morning. Cryo run in force: #84.
- DAQ monitor: main control & lost KIDs:
- Time lines & noise traces (arrays 1, 2 & 3):
March 14th, Friday
Telescope stopped, wind speed < 5 m/s; cryostat: T_MC=0.159K, T_Still=1.19K, T_4K=8.2.
New sweep try done (09:00-11:00): AM, MC, DJ, AB. Bad KIDs (a1, a2, a3): 10/953, 12/578, 9/1000.
Setting attenuation values again for array 3. Box S KIDs ones were retouched after a couple of sweeps. No changes in resonances tables of array 1 and 2 wrt. the previous version. DAQ restarted, level 6: attente.
The observed bump at ~0.3 Hz in array 3 is not evident now and the noise spectra have improved. Box C (array 2) KIDs (particularly KC037 and 025) still being noisy. Screenshots from the DAQ are shown below.
- DAQ monitor: main control & lost KIDs:
- Time lines & noise traces (arrays 1, 2 & 3):