Back to the NIKA2 Run 81 main page

Please find the results of the preliminary data reduction at this link.

NIKA2 Re-Commissioning: NIKA2 run 81, Cryo run 93

Observers on-site: M. Sánchez, A. Bongiovanni; Remote: TBD

Operators on-duty: Joaquín Santiago (day), Gloria Liñán (night)

Initialization files:
run92*.ini (previous sweep)
run93*.ini (new sweep)

Preliminary plan

Task

Done?

Remarks

New sweep, cryo run 93

First check (pointing/focus), total power, cryo run 92

First beam maps, cryo run 93, total power

Analyze preliminary beam maps and produce DAFs/RPPs (PIIC) for all arrays. Install the new DAFs/RPPs. Readapt focus script

First calib_1scan on flux calibrators, more (night time) beam maps in total power, skydips

Pointing session

Calib_1scan on flux calibrators, night time beam maps (polarimetry), skydips

Deep field (total power) session

Crab polarimetry scans (night time, pol-calibrations with Uranus)

N2EDF tests (total power), project 092-26, total power, acq. rate 47 Hz

Observing tests on Planck sources, project 093-26, total power

Test PCCS2 pointing catalog (see SB's email/cat)

Tables (from 2026/09/29 to 2026/10/06)

Tuesday, 29th September 2026

16:30-24:00 (LT):

Wednesday, 30th September 2026

00:00-16:00 (LT):

Thursday, 1st October 2026

00:00-03:30 (LT):

11:30-17:00 (LT):

Friday, 2nd October 2026

00:00-03:30 (LT):

11:30-17:00 (LT):

Saturday, 3rd Octomber 2026

11:30-17:00 (LT):

Sunday, 4th October 2026

11:30-17:00 (LT):

Monday, 5th October 2026

00:00-03:30 (LT):

11:30-17:00 (LT):

Tuesday, 6th October 2026

00:00-03:30 (LT):

DailyReportsNika2Run81 (last edited 2026-09-23 09:29:30 by NikaBolometer)