| == Mar. 24, 2026 == | Operators: Mario Cervera (day), Sergio Amaya (night) <<BR>> Organization of shifts: <<BR>> 22:00-04:00 LT: <<BR>> 04:00-10:00 LT: <<BR>> 10:00:16:00 LT: <<BR>> 16:00-22:00 LT: <<BR>> Initialization files: <<BR>> run91*.ini (previous sweep) <<BR>> run92*.ini (new sweep) == Tables (from 2026/03/24 ~15:00 LT to 2025/03/31 ~10:30:00 LT) == |||||||||||||| Focus sequences || || Scan nr || Target || Ar2 || Ar1 || Ar3 || Polarized? || Notes || || 20260324s153-157 || Uranus || 0.27 || 1.25 || n/a || no || Started at 1.0 mm; tadadada; Ar3 not available for now because of new sweep; Ar1 fit is marginal|| || 158-162 || Uranus || || || n/a || no || Started at 1.5 mm || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || |||||||| Beam maps (99 sub-scans)|| || Scan Nr || Target || Focus || Notes || || || || || || || || || || || |||||||| Polarization beam maps (95 sub-scans)|| || Scan Nr || Target || Focus || Notes || || || || || || || || || || || |||||||| Calibrators (calib_1scan) || || Scan Nr || Target || Focus || Notes || || || || || || || || || || || == Preliminary plan == We wish to do the following: * start in total power: point, focus (!), point, calib_1scan, beam maps (at least 2) * analyze focus difference between Ar1 and Ar2 * analyze beam maps and produce DAFs RPPs for the new Ar3. Install the new RPPs for Ar3 * analyze the focus difference between Ar1 and Ar3 * perform many focus sequences to have some statistics * polarimetry beam maps * more total power beam maps * out of focus total power beam maps * total power deep field (HLS 091828), to derive the new, final NEFD of NIKA2 TP * polarimetry deep field (3C286, M87, 3C353, ...?) to derive the new IQU NEFD of NIKA2-Pol * 084-25 polarimetry * 140-25, 146-25 polarimetry * 196-25 total power * test long subscans with our favorite, total power, 100 arcsec/s * C/2025 R3 Panstarrs, polarimetry * deep field 03h32m31.75s −27d46m51.5s, total power, 14x14 arcmin2, 100 arcsec/s * test Sgr A* polarimetry scan strategy * ... other wishes ... == Tuesday, 24th March 2026 == The team arrives safely to the observatory :-) we are all thrilled and super excited to test and use the new NIKA2++! During maintenance, the new make-imbf is transformed into the default one. From now on we will use only the new make-imbf and the old one will be kept inactive. We verify that the directory where the make-imbf wrote is now the "production" directory and that users can read its content. We also run the PIIC QL manually on a couple of old scans, of which William newly produces the files using the new make-imbf and writing them here. The QL reads and processes these scans regurlarly. Well done! We take over after maintenance at 14:45 UT. All is ready. We start with total power (TP). And we stop at scan nr zero, because we are in the clouds and the humidity is at 100%. The rain alarm rings loud! Progress of the day: * @17:45 UT we start!!! Total power, KIDs lost 17/8/14 (Ar3 without counting Box S) * Uranus... the moment of reckoning... pointing... both Ar2 and Ar1 are out of focus, which is promising! ... focus ... see table above (SIGH) |
Back to the NIKA2 Run 80 main page
Contents
NIKA2 Re-Commissioning: NIKA2 run 80, Cryo run 92
Observers on-site: Miren Muñoz, Mairi Nonhebel, Kaiyi Du, Stefano Berta, Ioannis Myserlis (remote), Angel Bongiovanni
Operators: Mario Cervera (day), Sergio Amaya (night)
Organization of shifts:
22:00-04:00 LT:
04:00-10:00 LT:
10:00:16:00 LT:
16:00-22:00 LT:
Initialization files:
run91*.ini (previous sweep)
run92*.ini (new sweep)
Tables (from 2026/03/24 ~15:00 LT to 2025/03/31 ~10:30:00 LT)
Focus sequences
Scan nr
Target
Ar2
Ar1
Ar3
Polarized?
Notes
20260324s153-157
Uranus
0.27
1.25
n/a
no
Started at 1.0 mm; tadadada; Ar3 not available for now because of new sweep; Ar1 fit is marginal
158-162
Uranus
n/a
no
Started at 1.5 mm
Beam maps (99 sub-scans)
Scan Nr
Target
Focus
Notes
Polarization beam maps (95 sub-scans)
Scan Nr
Target
Focus
Notes
Calibrators (calib_1scan)
Scan Nr
Target
Focus
Notes
Preliminary plan
We wish to do the following:
- start in total power: point, focus (!), point, calib_1scan, beam maps (at least 2)
- analyze focus difference between Ar1 and Ar2
- analyze beam maps and produce DAFs RPPs for the new Ar3. Install the new RPPs for Ar3
- analyze the focus difference between Ar1 and Ar3
- perform many focus sequences to have some statistics
- polarimetry beam maps
- more total power beam maps
- out of focus total power beam maps
- total power deep field (HLS 091828), to derive the new, final NEFD of NIKA2 TP
- polarimetry deep field (3C286, M87, 3C353, ...?) to derive the new IQU NEFD of NIKA2-Pol
- 084-25 polarimetry
- 140-25, 146-25 polarimetry
- 196-25 total power
- test long subscans with our favorite, total power, 100 arcsec/s
- C/2025 R3 Panstarrs, polarimetry
- deep field 03h32m31.75s −27d46m51.5s, total power, 14x14 arcmin2, 100 arcsec/s
- test Sgr A* polarimetry scan strategy
- ... other wishes ...
Tuesday, 24th March 2026
The team arrives safely to the observatory
we are all thrilled and super excited to test and use the new NIKA2++!
During maintenance, the new make-imbf is transformed into the default one. From now on we will use only the new make-imbf and the old one will be kept inactive. We verify that the directory where the make-imbf wrote is now the "production" directory and that users can read its content. We also run the PIIC QL manually on a couple of old scans, of which William newly produces the files using the new make-imbf and writing them here. The QL reads and processes these scans regurlarly. Well done!
We take over after maintenance at 14:45 UT. All is ready. We start with total power (TP). And we stop at scan nr zero, because we are in the clouds and the humidity is at 100%. The rain alarm rings loud!
Progress of the day:
- @17:45 UT we start!!! Total power, KIDs lost 17/8/14 (Ar3 without counting Box S)
- Uranus... the moment of reckoning... pointing... both Ar2 and Ar1 are out of focus, which is promising! ... focus ... see table above (SIGH)