According to the results obtained from processing data of June 2025 NIKA2 re-commissioning given here, DAFs RPP scheme used during run 73 is kept. Therefore, two different sets of DAFs for Ar1+3 and for Ar2 are used. In practice:

July 12th, 2025

These tests are being carried out in the framework of the first Heterodyne pool week of Summer 25. Thanks to all involved for their comprehension.

Albrecht (AoD) and Angel at the telescope. Operators on Duty: Gloria (night) and Kike. Cryostat ok (T_MC = 0.170 K, T_Still = 1.21 K, T_4K = 8.37 K).

DAQ started with the window closed for sampling some instrumental noise traces. Bad KIDs (Ar1/Ar2/Ar3): 12, 5, 14. Screenshots of noise traces, in that order: