Differences between revisions 6 and 8 (spanning 2 versions)
Revision 6 as of 2025-06-10 09:37:33
Size: 624
Comment:
Revision 8 as of 2025-06-10 09:43:09
Size: 801
Comment:
Deletions are marked like this. Additions are marked like this.
Line 16: Line 16:
11:00: All amplifiers are switched on. T_MC = 0.173 K. Noise traces at this time (ar2, ar1, ar3) are given below.  11:00: All amplifiers are switched on. T_MC = 0.173 K. Noise traces at this time (ar2, ar1, ar3) are given below.
Line 21: Line 21:

Traces of ar2 look better than the obtained in March (for a reference, see the Daily Report of Sunday, March 23rd, 2025 at https://publicwiki.iram.es/DailyReportsNika2Run72).

Back to the NIKA2 Run 73 main page

NIKA2 Re-Commissioning (2nd. part)

June 10th-12th + 16th-18th, 2025

NIKA2 run 73
Cryo run 85

Tuesday, June 10th, 2025

Mónica, Ioannis, Dave, Angel at the telescope. Starting DAQ at the beginning of the maintenance slot.

11:00: All amplifiers are switched on. T_MC = 0.173 K. Noise traces at this time (ar2, ar1, ar3) are given below.

noise_ar2_20250610.png noise_ar1_20250610.png noise_ar3_20250610.png

Traces of ar2 look better than the obtained in March (for a reference, see the Daily Report of Sunday, March 23rd, 2025 at https://publicwiki.iram.es/DailyReportsNika2Run72).

DailyReportsNika2Run73 (last edited 2025-07-12 19:33:49 by NikaBolometer)