|
Size: 345
Comment:
|
Size: 858
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 14: | Line 14: |
| Mónica, Ioannis, Dave, Angel at the telescope. Starting DAQ at the beginning of the maintenance slot. | Mónica, Ioannis, Dave, Angel at the telescope. Starting DAQ at the beginning of the maintenance slot. <<BR>> 11:00: All amplifiers are switched on. T_MC = 0.173 K. Noise traces at this time (ar2, ar1, ar3) are given below. <<BR>> {{attachment:noise_ar2_20250610.png||height="300"}} {{attachment:noise_ar1_20250610.png||height="300"}} {{attachment:noise_ar3_20250610.png||height="300"}} Traces of ar2 look qualitatively better than those in force during the campaign of March (for a comparison, see the Daily Report of Sunday, March 23rd, 2025 at https://publicwiki.iram.es/DailyReportsNika2Run72). <<BR>> |
Back to the NIKA2 Run 73 main page
NIKA2 Re-Commissioning (2nd. part)
June 10th-12th + 16th-18th, 2025
NIKA2 run 73
Cryo run 85
Tuesday, June 10th, 2025
Mónica, Ioannis, Dave, Angel at the telescope. Starting DAQ at the beginning of the maintenance slot.
11:00: All amplifiers are switched on. T_MC = 0.173 K. Noise traces at this time (ar2, ar1, ar3) are given below.
Traces of ar2 look qualitatively better than those in force during the campaign of March (for a comparison, see the Daily Report of Sunday, March 23rd, 2025 at https://publicwiki.iram.es/DailyReportsNika2Run72).
