NIKA2 Re-Commissioning
March 18th-25th + ...
NIKA2 run 72
Cryo run 84
Tuesday, March 18th, 2025
@10:30 a.m. Angel, Carsten, Monica, Stefano and maaany others arrived at the Telescope. There is a lot of snow 2-3m or more, accumulated by the wind in some spots), the windows of the dining room are completely covered. The sky is cloudy, but it seems that it might clear up a bit later. No precipitation at the moment
In the morning we check the NIKA2 traces:
- Ar1 looks fine.
- Ar3 has a big noise bump at ~0.3 Hz, common to all KIDs
- Ar2 has noisy KIDS in Box C. There is also a noise peak at ~10 Hz for a number of KIDs and a new spike at 6 Hz for KID KA156.
TBD We will upload some pics later
We have a briefing to make the point of what needs to be done first.
- the make-imbf is ready to be started and used. Both new and old versions are set to the current commissioning run
- New sweep: done on Wed 12/3. Ar1 OK. Ar3 noise bump. A second sweep was done on Fri 14/3, adjusting the Ar3 one. It looks better. Ar2 has the original sweep, defined in October 2024.
- Radio alignment check. the weather is not good enough. Maybe on Thursday we will have a chance. At the beginning we will start the operations without checking the alignment. Meanwhile we'll ask Dave if he'd be available on Thursday.
- check DAQ on sky. This is the first operation we will do:
- Point a bright source. and start an OTF
- Check traces to verify that we see the source
- check also the beam width on the traces
this will already tell us if a) we are on source; b) there are any problems with the dichroic and the beam
- small beam map: we will observe a small beam map (script already prepared by Nicolas and Angel), to be used by Nicolas to produce preliminary KIDPARS for the IDL pipeline
- with this, Nicolas will produce the first Kidpars.
- meanwhile we might observe already a first standard beam map for preliminary PIIC DAFs
- once the preliminary KIDPARS are ready, we proceed with pointing, focus, standard beam map, to be used to produce KIDPARS and DAFs for the whole array(s)
@13:15 LT: De-icing is switched on full power, but it's not fully working, there's some ice on the dish.