September 25, (Sunday)

img_mercury2mm.jpg

maps_focus_otf_20160925s331.png plot_20160925s331.png

September 24, (Saturday)

* 13h30. Start condensation.

* 17h. Cold enough for us to check the feedlines. ALL THE 20 ARE CONNECTED !!!! Finally good news. However, we still wait to see which temperature the cryostat will reach. So far around 1.1K, still condensing the mixture in the trap.

* 20h. The small traps got blocked immediately. I switch to the big one. I have connected all the 40 cables on the cryostat.

* 22h. The good news is that the cryostat reached 300mK (still at 1.2K), enough to see the resonances and probably to acquire a geometry tomorrow. I try before the night to pump the helium remained trapped in the small trap that is blocked but not entirely. Done at 22h25, I re-condense the 50 mbars of mixture that are back into the reserve.

September 23, (Friday)

September 22, (Thursday)

September 21, (Wednesday)

September 20, (Tuesday)

September 19, (Monday)

September 2016, 18 (Sunday)

September 2016, 17 (Saturday)

September 2016, 16 (Friday)

September 2016, 15 (Thursday)