Back to the NIKA2 run 3 main page
January 2016, 12 (Tuesday)
- Olivier, Alessandro and Florian arrived at the telescope.
The new boards installed and connected
Array 1 (1mm - IN-OUT 5-12): NIKEL_RF (192.168.1.150)
Array 2 (2mm - IN-OUT 1-4): NIKEL_USB (192.168.1.221-24)
Array 3 (1mm - IN-OUT 13/20): NIKEL_DC (192.168.1.170)
January 2016, 13 (Wednesday)
NIKA2 HAS ALL THE 20 LINES CONNECTED AND ALL WITH RESONANCES. WE ARE IN THE 3000 PIXELS ERA.