Line 23: Line 23:
{{attachment:150930_1_ready_to_lift_NIKA2_cryostat.JPG||height=215}} {{attachment:150930_2_NIKA2_cryostat_through_trapdoor.JPG||height=215}} {{attachment:150930_3_future_location_of_NIKA2.JPG||height=215}} {{attachment:150930_4_tilting_NIKA2_from_vertical_to_horizontal.JPG||height=215}} {{attachment:150930_5_sliding_NIKA2_in_corridor_passing_EMIR.JPG||height=215}} {{attachment:150930_6_NIKA2_cryostat_at_destination.JPG||height=215}} {{attachment:150930_7_install_He_pipes_along_azimuth_column_and_cable_spiral.JPG||height=215}} {{attachment:150930_8_He_pipes_from_cable_spiral_to_compressors_corner.JPG||height=215}} {{attachment:150930_9_NIKA2_turned_toward_its_final_location.JPG||height=215}} {{attachment:150930_10_5_pipes_2_compressors_1_dilution_fridge_bench.JPG||height=215}} {{attachment:150930_11_lifting_NIKA2_nose.JPG||height=215}} {{attachment:150930_12_lifting_polariser_wheel.JPG||height=215}} {{attachment:150930_13_hole_for_pulse_tube_head_on_NIKA2.JPG||height=215}} {{attachment:150930_14_installing_pulse_tube_head_on_NIKA2.JPG||height=215}} {{attachment:150930_15_cryogenics_pipes_plugged_on_NIKA2.JPG||height=215}} {{attachment:150930_16_opening_NIKA2_cryostat.JPG||height=215}} {{attachment:150930_17_100mK_optics_and_detectors_frame.JPG||height=215}} {{attachment:150930_1_ready_to_lift_NIKA2_cryostat.JPG||height=215}} {{attachment:150930_2_NIKA2_cryostat_through_trapdoor.JPG||height=215}} {{attachment:150930_3_future_location_of_NIKA2.JPG||height=215}} {{attachment:150930_4_tilting_NIKA2_from_vertical_to_horizontal.JPG||height=215}} {{attachment:150930_5_sliding_NIKA2_in_corridor_passing_EMIR.JPG||height=215}} {{attachment:150930_6_NIKA2_turned_toward_its_final_location.JPG||height=215}} {{attachment:150930_7_NIKA2_cryostat_at_destination.JPG||height=215}} {{attachment:150930_8_install_He_pipes_along_azimuth_column_and_cable_spiral.JPG||height=215}} {{attachment:150930_9_He_pipes_from_cable_spiral_to_compressors_corner.JPG||height=215}} {{attachment:150930_10_5_pipes_2_compressors_1_dilution_fridge_bench.JPG||height=215}} {{attachment:150930_11_lifting_NIKA2_nose.JPG||height=215}} {{attachment:150930_12_lifting_polariser_wheel.JPG||height=215}} {{attachment:150930_13_hole_for_pulse_tube_head_on_NIKA2.JPG||height=215}} {{attachment:150930_14_installing_pulse_tube_head_on_NIKA2.JPG||height=215}} {{attachment:150930_15_cryogenics_pipes_plugged_on_NIKA2.JPG||height=215}} {{attachment:150930_16_opening_NIKA2_cryostat.JPG||height=215}} {{attachment:150930_17_100mK_optics_and_detectors_frame.JPG||height=215}}

Back to the NIKA2 run 1 main page

September 2015, 24

The 2 1st trucks transporting NIKA2 hardware have arrived at the telescope, and have been unloaded.
The 3rd truck containing the cryostat and driven by Alessandro, Martino and Andrea will arrive on Tuesday 29 in the morning. Alain, Samuel and Johannes will also arrive on Tuesday morning.

September 2015, 29

Everybody has arrived at the telescope this morning: Alessandro, Andrea and Martino with the truck, Alain, Johannes and Samuel with the IRAM transport, with some Granada staff (Santiago, Juan, Dave, Gregorio, etc) who will help installing NIKA2.
There's about 2 tons of material to install. We have installed about half of it: compressors and dilution pump in the cable spiral room, automat (cryogenics control) and pulse tub cold heads on the wall in the receiver cabin, optical fibre switch, some electronics and computers in the control room, He pipes at intermediate stage, plug and test communication with these hardware.
150929_1_NIKA2_boxes_in_garage.JPG 150929_2_NIKA2_noze_in_garage.JPG 150929_3_ready_to_lift_compressor_dilution-pump_and_box.JPG 150929_4_unloading_NIKA2_cryostat_from_truck.JPG 150929_5_lifting_up_He_pipes.JPG 150929_6_preparing_cabin_wall_for_cryogenic_head_and_automat.JPG 150929_7_compressors_and_dilution_bench_in_cable-spiral-room.JPG 150929_8_pulse-tube-cold-head_cryogenics-automat_on_cabin_wall.JPG 150929_9_testing_electronics_in_control_room.JPG

September 2015, 30

1st big operation of the day: we have lifted the NIKA2 cryostat up in the cabin and installed it at its nominal position. 2nd big operation: we have installed the He pipes: from the instrument, down along the azimuth column to the cable spiral and then to the compressors. We have also plugged all the pipes, lifted the cryostat nose, lifted the polariser wheel, installed bars, rails, pulse tubes cold heads, opened and check the screens of the cryostat down to the detector holder frame.
150930_1_ready_to_lift_NIKA2_cryostat.JPG 150930_2_NIKA2_cryostat_through_trapdoor.JPG 150930_3_future_location_of_NIKA2.JPG 150930_4_tilting_NIKA2_from_vertical_to_horizontal.JPG 150930_5_sliding_NIKA2_in_corridor_passing_EMIR.JPG 150930_6_NIKA2_turned_toward_its_final_location.JPG 150930_7_NIKA2_cryostat_at_destination.JPG 150930_8_install_He_pipes_along_azimuth_column_and_cable_spiral.JPG 150930_9_He_pipes_from_cable_spiral_to_compressors_corner.JPG 150930_10_5_pipes_2_compressors_1_dilution_fridge_bench.JPG 150930_11_lifting_NIKA2_nose.JPG 150930_12_lifting_polariser_wheel.JPG 150930_13_hole_for_pulse_tube_head_on_NIKA2.JPG 150930_14_installing_pulse_tube_head_on_NIKA2.JPG 150930_15_cryogenics_pipes_plugged_on_NIKA2.JPG 150930_16_opening_NIKA2_cryostat.JPG 150930_17_100mK_optics_and_detectors_frame.JPG

October 2015, 01

DailyReportsNika2Run1 (last edited 2015-11-18 15:04:06 by NikaBolometer)