until full treatment of the beammaps | until full treatment of the beammaps. Meanwhile Juan - with some help by Stefano - solves two long-standing issues: now v3 imbfits contain the sweep frequencies and the signal is positive. [[attachment:P1160543_mod_sm.JPG|{{attachment:P1160543_mod_sm.JPG||height=250}}|target="_blank"]] |
Contents
Daily Reports
March 19th (Tuesday)
Bilal, Alessia, Stefano, Juan, Isabelle, Pablo T. arrived.
[Afternoon shift: Bilal & Stefano]
18h00 UT started with V3 acquisition after maintenance delayed because of VAC1 problems. Unstable and cloudy sky.
[Night shift: Juan & Pablo]
Very good weather conditions, opacity around 0.1. We performed observations for LPSZ , GASTON and Saturn/Iapetus
March 20th (Wednesday)
[Morning shift: Isabelle & Alessia]
Observing with good opacity and clear sky until ~11h20. Observed project 111-18, 159-18. Bad sky, unstable, cloudy since then. Telescope left to Juan P. to perform technical tests.
[Afternoon shift: Bilal & Stefano]
Fog.
[Night shift: Juan & Pablo] The wind was too strong at the beginning of the night and we could not start observations until 3h15 UTC.
March 21st (Thursday)
[Morning shift: Isabelle & Alessia]
Observing in very good conditions until 11h UTC. Projects observed: GASTON, 111-18 and 159-18. Observations disturbed by the ski station snow gun. Pictures below.
[Afternoon shift: Bilal & Stefano]
March 22st (Friday)
[Night shift: Juan & Samuel]
Observations with DAQV3 old parameters. Mostly 199-16 (GT_LP SZ) and 122-16 (GT-LP GASTON), plus some additional nikaw18 for completing V3 checklist.
[Morning shift: Alessia & Isabelle]
6h40 UTC: change to DAQV1 with new parameters. From scan #75 on.
[Afternoon shift: Bilal & Stefano] We switch to new parameter file for A1 and A3. Did 3 beammap and switch back to the old parameter until full treatment of the beammaps.
Meanwhile Juan - with some help by Stefano - solves two long-standing issues: now v3 imbfits contain the sweep frequencies and the signal is positive.
[Night shift: Juan & Samuel]
Weather conditions were unstable at the beginning of the night. We mainly concentrated in project 193-18.
[Morning shift: Alessia & Isabelle]